TPU / TPE 3D Printer Filament Extrusion Line Tolerance between plus or reduce 0.02
Negotiable /Piece
Min.Order:1 Piece
Dongguan Songhu Plastic Machinery Co., Ltd.
Desktop Digital 3D Printer Machine With Metal Frame , Foldable 3D Printer
Pla Filament 1.75mm , Filament Extruder For 3D Printing CE and National Patent
TPU / PVC / PA Plastic Tube Making Machine 20*1.5*1.8 m 60kw Power
Filament Vacuum Packing Machines , 3D Printer Vacuum Packaging Equipment
High Stability Single Head 3D Printers For Education , 70-120mm/s Print Speed
TPU / TPE 3D Printer Filament Extrusion Line Tolerance between plus or reduce 0.02
Specifications
1. Diameter: 1.75mm,3.0mm
2.Material: ABS,PLA
3.Application: 3D printer raw materials
4. also can make other prouduts
Features:
1,Material : PLA ABS
2,Diameter : 1.75mm 3.0mm
3,Shape : round
4,Color : bule,red,orange,yellow,green .
5,Usage : be applied to a variety of 3D printer, Makerbot, Mendel, Prusa, Huxley, BFB series, etc..
Specificaitons as below:
Songhu PLA filament making machine configurations and quotation:
Φ45 extruder (one set)
50kg hopper dryer: one set
Auto-loader: one set
Screw diameter: 50mm
Screw L/D: 28:1
Screw structure: special
Reducer unit (one set)
Control power: 11kw
Use China named brand SEIMENS control
Control style: frequency conversion (TAIWAN DELTA)
Belt transmission between motor and gear box.
Thermostat zones: 4 zones 2 kw for each zone
Use stainless steel heater
Use Huibang temperature controller
Cooling zones: 3 zones 0.18 kw for each zone
Used TAIWAN named brand blower
Electrical control box (one set)
Flange : one set
Extruding die : one set
Round filament diameter : Ø1.75- 3.0mm
6m stainless steel cooling water tank : one set
Water tank stand : one set
Double shaft haul off unit: one set
Haul off control power: 0.75kw
Control style: frequency conversion
Winding unit: one set
Work shaft: 2
Motor power: 1.5KW
Control style: moment motor control
Encoder can control the length of winding, it will stop and warning when winding enough.
Packing and After sales Service
Technical documents
We will offer you all necessary documents, e.g. general layout plan, water scheme, electrical diagram and
user manual after the contract is executed.
Arrangement for inspection, installation and testing work
a. After being informed machines ready for inspection, customer can send engineers to our factory.
b. After the machines are delivered to customer’s factory;We will send one or two technicians to the factory
after preparation work is completed;Technicians will be responsible for guide on-site installation and testing
machines.
c. Meanwhile technicians will give free training lessons to labors in customer’s factory.
If you have any problem, please feel free to contact with me! !!