Multi Function Polyurethane Casting Machine With High Precision Metering Unit
USD $18500 - $26500 /Piece
Min.Order:1 Piece
Cyclopentane High Pressure Polyurethane Foam Machine HW ( R ) - 20 380V 18KW
Mixing PU Low Pressure Foaming Machine Prepolymer 500 - 2000 Mpas Viscosity
Polyurethane Elastomer MOCA PU Foam Machinery With Metering Accuracy 5
18 KW High Pressure Foaming Machine For Refrigerator / Freezer / CFC - Free Foam
Micro Computer High Pressure Polyurethane Metering Machine For PU Sandwich Panel
High Pressure Foaming Machine / Pouring Machine For PU Sandwich Panel
Multi Function Polyurethane Casting Machine With High Precision Metering Unit
PLC control Low Pressure Metering Machine for polyurethane elastomer machine used making roller
Mix head
Mixing by agitator for better mixing performance
New-designed pouring valve for precision dosing, high degree of vacuum ensures no visual cellular
Color additive available
Individual controller for mix head
Metering Unit
High precision, low speed positive displacement gear pump
Variable output and matching adjusted by inverter
Coupling connect pump and motor, seal by DOP
Components Storage and Temperature Conditioning
Jacketed tanks with visual level tube
Digital pressure gauge for control and visualization of pressure with max. alarm value
Electrical resistance heater for temperature conditioning operation
Low speed agitator for even temperature distribution
Electrical Control System
Fully controlled by SCM (single chip microcomputer)
OP7 operating panel, easy to use, have function of machine parameter setting, pouring time, temperature and cleaning control
Alarm function with acoustic warning
Model | Output(1:1)g/s | Tank(L) | Power(KW) | ||
Min. | Max. | Prepolymer | MOCA | ||
BL(E)-1 | 200 | 800 | 120 | 30 | 17 |
BL(E)-5 | 1000 | 5000 | 150 | 30 | 19 |
BL(E)-10 | 3000 | 8000 | 220 | 40 | 23 |
BL(E)-15 | 5000 | 15000 | 220 | 40 | 26 |
BL(E)-25 | 8000 | 24000 | 300 | 40 | 33 |
4.
Taken the after-sales service and technical support
1. provide free technical guidance equipment installation and debugging.
2. equipment warranty for 12 months.
packaging & Shipping
Packaging Details: steel frame with plywood panel
Delivery Details: 20 working days after received deposit
Other Terms
1. Payment terms
The buyer should pay the prepayment of T/T 30% of the total amount and the left 70% of total amount should be paid to the seller by T/T
2. Delivery time
The producing time is 20 work days after receiving 30% deposit.
3. Inspection
Inspection place is the seller’s factory.
4. Force - majeure circumstances
Due to force majeure the contract may be terminated automatically.
5. Ownership
The ownership of the above mentioned products transfer from the seller to the buyer at time of delivery. If the buyer shall not pay, the ownership of the products belongs to the seller.
6. Arbitrage
All disputes and disagreement that may arouse in connection with the present Contract, both sides of the present Contract could solve by negotiation firstly, or else both sides can go to “Qingdao Arbitration Commission” for a fair solving result.