Product Details

Soft Sports Ball Making Polyurethane Molding Machine With PU Foam Injection

Brand Name Ecorin
Place of Origin China
Model Number BL(F)-1/5/15/35/60/120

Product Features

Delivery Time:20 working days after prepaid money arrived
Certification:ISO TUV

Soft Sports Ball Making Polyurethane Molding Machine With PU Foam Injection

New type for the soft ball for sports making Low pressure injection molding machine polyurethane foam machine

 Mix Head

a) mixing by agitator for better mixing performance

b) new-designed pouring valve for precision dosing

c) auto-cleaning function

d) color additive available

e) individual equipped controller for mix head

Metering Unit

a) high precision, low speed positive displacement gear pump

b) variable output adjusted by VFD

c) shaft seal with coupling and DOP

Components Storage and Temperature Conditioning

a) jacketed tanks with visual level tube

b) digital pressure gauge for control and visualization of pressure with max.alarm valve

c) electrical resistance heater for temperature conditioning

d) low speed agitator for even temperature distribution

e) chiller for option

Electrical Control System

a) fully controlled by SCM( single chip microcomputer)

b) OP7 operator panel for simple and user friendly setting of machine parameter, status showing, pouring time, temperature control and cleaning control, etc.

c) alarm funtion with acoustic warning

Parameter:

model output(1:1)gs min output(1:1)gs max tank L Power KW
BL(F)-1 3.3 13.3 60 6
BL(F)-5 16.6 66.6 80 8
BL(F)-15 50 250 120 9
BL(F)-35 100 600 120 12
BL(F)-60 250 1000 200 13
BL(F)-120 666.6 2000 200 15

Application:

Car seat,Seating, Backrest, soft toy,soft ball, ect.

After-Sales Service

One year free warranty, but the equipment caused by natural wear and human responsibility for the quality are not covered under warranty.

After the warranty period, the supplier provide long-term tracking service.

Packaging & Shipping

Packaging Details: steel frame with plywood panel

Delivery Details: 20 working days after received deposit

Our Service:

1. Take our valued client as priority, make sure equipment quality and answer clients’ questions anytime and anywhere.

2. Customizing machines according to clients' needs, such as different design, different brand parts, different colors, more function and etc.

3. Engineers go to clients' factory to install machines in time.

4. More spare parts given to clients for free to ensure the factory working without suddenly stop.

FAQ:

Q: Does your machine have CE certification?

A: Yes,our machine with CE certification.

Q: How about payment terms for machines?

A: 30% TT deposit + 70% TT before shipment,50% TT deposit + 50% LC balance, Flexible payment can be negotiated.

Q: Installation and commissioning for foam production line?

A: We will send our engineer for installation and commissioning, but relevant cost will be paid by you.

Q: Do you have some videos where we can see the line producing?

A: Yes, we can provide some videos for reference.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now