1100 MW thermal Power Plant Equipment

1100 MW thermal Power Plant Equipment

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
0 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
HIWING
Place of Origin:
China

HiWING Mechanical & Electrical Technology Corp

Business Type: Trading Company
Main Products: Unmanned Aerial Vehicle

Product Details

Certification:ISO9001
1100 MW thermal Power Plant Equipment Quick Details

The Air Preheater Transmission Frequency Conversion Control System(is a transmission control device using transducer to realize soft startup of rotary air preheater,is applicable for supporting and reconstruction of air preheaters in 65MW~1100 MW thermal power generator set and also applicable for transmission control of GGH in desulfurizing system.)

Key words:Air Preheater

Transmission Frequency Conversion Control System

The Air Preheater Transmission Frequency Conversion Control System is a transmission control device using transducer to realize soft startup of rotary air preheater. It has many advantages including big torque, small mechanical impact and power grid impact, stable and reliable operation and so on. It is an ideal transmission control system for rotary air preheater and similar high inertia loads. The system has three grades, i.e. high speed, low speed and debugging, so that different operation requirements can be met. The primary motor and the standby motor can be switched automatically. The standby motor can be switched to the standby motor automatically when the main motor is in fault. The system has two operation modes called remote and local. There is a changing switch in the control cabinet. It can give the primary motor and the standby motor running current signal; The system can output the alarm signal when the transducer is in fault, motor overload or the rotor stops, and it will never stop if overvoltage appears.

Application fields

The Air Preheater Transmission Frequency Conversion Control System is applicable for supporting and reconstruction of air preheaters in 65MW~1100 MW thermal power generator set and also applicable for transmission control of GGH in desulfurizing system.

Technical parameters

Parameters

Value

Remark

Power of transducer

≥7.5kW

Power supply

AC 380V/400V/415V 50Hz 

Two three-phase four-wire lines, (for production and security)

Output load

5A /AC 240V  5A /DC 28V

Ambient temperature

-10℃~50℃

Relative humidity

<85%

Degree of protection

IP56

Domestic and international cooperation projects 

Shandong Chiping Xinyuan power plant 2x330MW project.

Xinjiang Kashi power plant 2x350MW project.

Xiangtan power plant air preheater reconstruction project.

Philippines Mariveles power plant 2x325MW project.

Indonesia Awar power plant 2x350MW project.

Russia Troitsk power plant 1x660MW project.

Contact Supplier

Ms Zhang Chat Now
Telephone
86-010-63788996
Mobile
86-01063788996
Fax
86-010-63788658
Address
7th,Tower1,No1,HaiYingRoad,FengTai Science Park, FengTai District Weifang,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Electronic Components & Supplies > Electronic Accessories & Supplies > Electrical Ceramics
Categories
Hi~