Assemble adjustable Semi-diameter curved formwork , abnormal wood formwork
Negotiable /Piece
Min.Order:1 Piece
Zulin Formwork & Scaffolding Co., Ltd
Shoring scaffolding systems tower formwork in building construction
Durable Building Formwork panel for Puchong Financial Corporate Centre ( Malaysia )
Steel Frame adjustable column formwork for concrete structures , building formwork
Safe Load Bearing Scaffolding Table Formwork System For Construction , Bridge Building
Industrial steel formwork for concrete slab , metal formwork in construction
Adjustable Semi-diameter Arced Formwork , steel formwork construction for Colombo lotus tower
Assemble adjustable Semi-diameter curved formwork , abnormal wood formwork
It can be used for any curved wall with the semi-diameter longer than 1.10m
Adjustable acted Formwork Profile
Adjustable Semi-diameter Arced Formwork On the basis of the foreign company technology, we developed the
Adjustable Semi-diameter Arced Formwork, which can be used for any curved wall with the semi-diameter longer than 1.10m. Traditionally, the formwork is produced in accordance with the designed semi-diameter,
which is one-off use, causing much material wasting. All the defects of the traditional formworks are overcome
after we developed the Adjustable semi-diameter arced formwork. Also, we lease the formwork out to the
contractors to save their cost, which proves good effect.
Adjustable acted Formwork\'s panel is 18mm Plywood,because the panel specification is 2440×1220 mm,so the
formwork max width is 2440mmUpright rib is combination steel frame ,the panel and the steel frame is
connected by bolt ;
Horizontal rib is short Double-side V-iron , there are adjustable connectors between V-iron.Upright side-rit is angle
steel .
The radius can be regulated at any time when meet to different section. Adjustable Acted Formwork Technique
parameter:
Allowed Load50-70KN/M2 Per square meter65KG
Advantage of the product
Can be adjusted to any curved wall with a semi-diameter longer than 1.1m
Easy and quick operation.
Low cost and wide use.
High standard elements.
Assembly procedure
1. Assemble timber beam and timber connector.
2. Assemble plywood and edge rib.
3. Assemble adjustable system.
4. Assemble connecting waling.
5. Adjust the formwork, make the formwork bent into designed radius.
6. Connect every module by adjustable steel clamp.
Specifications:
Arced formwork, abnormal wood formwork. The detail is below:
Project: |
Water Tower (burkina faso) |
Client: |
Compagnie Generale des Entreprises |
Date: |
05/2012 |
Formwork Type: |
Arced formwork,Shoring Tower |
Comments of client: |
We choose Zulin, because he offer us excellent design plan and satisfy us from each aspect. We like Zulin, because his design is not only safe but also high efficiency. |