Construction Materials Rebar Parallel Thread Coupler for Pakistan Ballotta Hydropower Station
Negotiable
Min.Order:1
CHANGZHOU JIANLIAN REINFORCING BAR CONJUNCTION CO., LTD1
Mechanical Splices Reinforcement Couplers for Hangzhou Bay Sea Crossing Bridge , China
Cold Extrusion Pressing Coupler Mechanical Rebar Splice Jeddah Pumping Station , Saudi Arabia
Threaded Mechanical Rebar Splice for Shanghai Oriental Pearl Tower , China
Rebar Coupling Mechanical Connector for Qinshan Nuclear Power Station , China
High Accuracy Reinforcing Bar Coupler POSITION COUPLER for Link Two Steel Bar
Parallel Thread Hydraulic Quick Coupler / Connect Under Pressure Couplings
Rebar Splice Coupler Of Super Upset Forging Splicing , High Strength
Specifications:
Steel bar diameter |
Outer diameter of coupler (MM) |
Length of coupler (MM) |
Size of thread (MM) |
12 |
20 |
30 |
M14*2.0 |
14 |
22 |
34 |
M16*2.0 |
16 |
26 |
40 |
M20*2.5 |
18 |
29 |
44 |
M22*2.5 |
20 |
32 |
48 |
M24*3.0 |
22 |
36 |
52 |
M27*3.0 |
25 |
40 |
60 |
M30*3.5 |
28 |
44.5 |
66 |
M33*3.5 |
32 |
50 |
72 |
M36*4.0 |
36 |
56 |
80 |
M39*4.0 |
40 |
62 |
90 |
M45*4.0 |
Description:
JBCZ construction materials- rebar parallel thread coupler is belong upset forging parallel thread system.
It can link two rebars whose diameter is from 12mm to 40mm.
Total installed capacity of 1475 mw, Pakistan ballotta hydropower station was built in the Indus river, on
August 1, 2003, unit 2 official grid power, into commercial operation, in April 2004, all completed and put
into operation for 5 generating units.
And in this famous project , uesd JBCZ ‘s rebar connection technology.
Applications:
Public Project |
The barrow dam ,Pakistan |
Competitive Advantage:
Designed to splice the same diameter bars Installs quickly and easily High efficient High adaptability