Safe modular scaffolding construction formwork Easy and quick assembling
Negotiable /Set
Min.Order:1 Set
Economical Permanent Bridge Deck Formwork With Channel Beam , mivan system formwork
GTF System with Bridge Deck Construction High Construction Efficiency
Bridge Formwork System for Preformed Unit , mivan aluminium formwork construction
High Load Bearing steel material Girder Box Formwork for Preformed Unit
Permanent bridge deck formwork in construction Good economic performance
Waterproof concrete slab formwork / Civil Formwork with Props adjustable
Detailed Product Description
scaffolding formwork
modular scaffolding
scaffolding & formwork
Neat , Safe Protection Scaffold / Construction Scaffolds PS-50 System
Description:
1. Brief introduction
A kind of new construction protection system, it is applying operating platform and safer job location for construction corps.
2. Competitive advantage
①. Easy and quick assembling
②. Lifting as a group, it is rapid and economic
③. Auto-climbing
Protection bracket can climb by hydraulic system.
Here are some parameters:
Rated pressure: 20Mpa
Climbing speed: 0.33m/min
Oil cylinder stroke: 435mm
④.Safe and reliable anchor system
⑤.High work efficiency with work platform and unload platform
⑥.High light transmittance with the hollow block
3. Applications