High separation efficiency Lamella Clarifiers water treatment / inclined plate clarifier
Negotiable /Piece
Min.Order:1 Piece
CBS Continuous Backwash Sand Filter System , Industrial Water Filters
CE / ISO water filtering spiral grit separator for sewage treatment plant
Multi - ring screw press Sludge Dewatering Equipment for Wastewater Treatment Plant
CSM drum type spiral screen , grit screen for sewage wastewater treatment
Static screening in wastewater treatment , sewage treatment equipment
Industrial DAF dissolved air flotation wastewater treatment for Fish processing
High separation efficiency Lamella Clarifiers water treatment / inclined plate clarifier
Specifications:
Type size |
Treatment Capacity |
Tank Length (mm) |
Tank Width (mm) |
Tank Height (mm) |
SAL-10 |
10m³/h |
2.4 |
1.2 |
3.5 |
SAL-15 |
15 m³/h |
3.0 |
1.2 |
4.0 |
SAL-20 |
20m³/h |
3.0 |
1.8 |
4.0 |
SAL-35 |
35m³/h |
3.4 |
1.8 |
4.5 |
SAL-65 |
65 m³/h |
4.3 |
1.8 |
5.0 |
SAL-100 |
100m³/h |
4.6 |
2.7 |
5.5 |
Description:
The SAL lamella clarifier uses the time proven concept of inclined plate clarification. This type of clarifier uses gravity in conjunction with the projected settling area of the 60 degree angle parallel plates to settle solids from the pre-treated liquid flow. This treated liquid flows first to the flocculation tank where polymer is added to promote floc growth, then down to the bottom of the clarifier and up through the plate pack(s) while the solids settle out to the bottom sludge cone or cones – depending upon the size. The solids are intermittently taken from the bottom cone tank for further setting of the solids and then, finally to a filter press for final dewatering.
Applications:
Municipal
Filtration Pretreatment Backwash Water Treatment Primary and Secondary Settling Tertiary TreatmentIndustrial
Metal Hydroxide Wastewater Industrial Process Water Pressure / Vacuum Filtrate Clarification Specific Minerals ApplicationsCompetitive Advantage:
1.Compact footprint is up to 1/10 the size of a conventional sedimentation tank
Flow enters through the side of the plates rather than underneath providing uninterrupted settling
2.Even pressure drop across collection channels makes the most of available plate area and creates uniform flow distribution
3.Standard sizing reduces engineering lead time and costs
4.Pre-engineered drawings and specifications shorten project schedules