High separation efficiency Lamella Clarifiers water treatment / inclined plate clarifier

High separation efficiency Lamella Clarifiers water treatment / inclined plate clarifier

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
0 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
CHENENG
Place of Origin:
China
Model Number:
SAL

WUXI CHENENG ENVIRONMENT ENGINEER

Business Type: Trading Company
Jiangsu China
Main Products:

Product Details

Delivery Time:30 working days after received your payment
Certification:CE/ISO

High separation efficiency Lamella Clarifiers water treatment / inclined plate clarifier

Specifications:

Type

size

Treatment

Capacity
(m³/h)

Tank

Length

(mm)

Tank

Width

(mm)

Tank

Height

(mm)

SAL-10

10m³/h

2.4

1.2

3.5

SAL-15

15 m³/h

3.0

1.2

4.0

SAL-20

20m³/h

3.0

1.8

4.0

SAL-35

35m³/h

3.4

1.8

4.5

SAL-65

65 m³/h

4.3

1.8

5.0

SAL-100

100m³/h

4.6

2.7

5.5

Description:

The SAL lamella clarifier uses the time proven concept of inclined plate clarification. This type of clarifier uses gravity in conjunction with the projected settling area of the 60 degree angle parallel plates to settle solids from the pre-treated liquid flow. This treated liquid flows first to the flocculation tank where polymer is added to promote floc growth, then down to the bottom of the clarifier and up through the plate pack(s) while the solids settle out to the bottom sludge cone or cones – depending upon the size.  The solids are intermittently taken from the bottom cone tank for further setting of the solids and then, finally to a filter press for final dewatering.

Applications:

Municipal

Filtration Pretreatment Backwash Water Treatment Primary and Secondary Settling Tertiary Treatment

Industrial

Metal Hydroxide Wastewater Industrial Process Water Pressure / Vacuum Filtrate Clarification Specific Minerals Applications

Competitive Advantage:

1.Compact footprint is up to 1/10 the size of a conventional sedimentation tank

Flow enters through the side of the plates rather than underneath providing uninterrupted settling

2.Even pressure drop across collection channels makes the most of available plate area and creates uniform flow distribution

3.Standard sizing reduces engineering lead time and costs

4.Pre-engineered drawings and specifications shorten project schedules

Contact Supplier

Mr. li sale Manager Chat Now
Telephone
86-0510-85121418
Mobile
86-15951564532
Fax
86-0510-85121418
Skype
hanford2015
Address
Zhoutie industrial park, Wuxi, Jiangsu, P.R.C. Wuxi,Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Mechanical Parts & Fabrication Services > Welding & Soldering Supplies > Electrode Holders
Categories
Hi~