dual ram BOP
USD $1000 - $1000 /Set
Min.Order:1 Set
1, API 16A Ram BOP
2, Bore dia.: 7 1/16"-26 3/4"
3.Pressure:14MPa to 140MPa
4.Cameron and Shafer
5.forged and casting
Use seal rings assembly to improve sealing of side door;
Use floating type ram. Front ram rubber is separated from top ram rubber, making it more reliable in sealing and easier to change;
Use buried oil way inside body. Loading hinge is separated from hydraulic hinge;
Compact hinge structure makes it easy to assemble and disassemble;
Use arc-shaped body chamber with four round corners as transition section to reduce stress peak value whenever bearing the pressure;
Ram cavity can be fitted with ram assembly of same type BOP made abroad;