Product Details

Alloy Steel Tube

Product Features

Specification & Steel Grade: 
ASME SA213M: T11, T12, T22, T2,T5, T9, T91 etc; 
ASME SA335M: P11, P12, P22, P2,P5, P9, P91 etc; 
ASME SA199M: T11, T12, T5 etc; 
ASME SA209M: T1, T1a, T1b; 
EN10216-2: 10CrMo5-5, 11CrMo9-10 etc; 
JIS G3462: STBA12, STBA13, STBA24 etc; 
ASTM/ASME 
A213 T5, T9, T11, T12, T22, T91 
A333 GRADE 1&6 
A335 GRADE P5, P9, P11, P12, P22, P91

 

Test and inspection perfomed: 
Chemical Composition Mechanical Properties 
Dimension and Visual Test Non-destructive Examination 
Sulfide Stress-cracking Test 
Delivery Condition:Annealed, Annealed Stress Relieved, Cold Drawn/Hard, Cold Drawn/Soft, Normalized, Clean Annealing. 
Surface treatment:Oil, Vanish, Shot Blasting,etc. 


 

DIN
DIN17175 ST35.8, ST45.8, 15Mo3, 13CrMo44, 10CrMo910 
DIN2448/1629/1630, ST37, ST37.4, ST44. ST44.4, ST52, ST52.4 

EN
EN10216-1 P195TR1, P195TR2, P235TR1, P235TR2, P265TR1, P265TR2 
EN10216-2, 16MO3, 10CrMo5-5, 13CrMo4-5, 10CrMo9-10 
EN10216-3, P275NL1/NL2, P355NL1/NL2, 
EN10216-4, P215NL1, P255QL, P265NL

High Alloy steel grade: T1, T2, T5, T9, T11, T12, T22, T91
Size: OD 1/2”to 16”WT 1.0 to 40.5mm, Length Max.12 Meters; 
Application: For Heat Exchanger, Superheater and Boiler.
The pipes are widely used in the fields of petroleum, electric power, boilers, chemical, ship building, geology exploration, mechanic and etc.


Production Description: 
1) Heat Treatment: Normalizing+ temper
2) Continuous Stenciling If You Require 
3) Antirust, Lubricating Treatment 
4) Adding Plastics in both sides 
5) Bale Into Hexagon, Max 2000 Kg/Bundle, Strengthening With Reinforcing Rod 
6) Smooth Surface, Mechanical Properties equilibrium, Tightness Tolerance 
Optional Information

1) Cold drawn seamless steel tube/pipe 
2) Certificate:ISO9001:2000,PED,API 5L, API 5CT, TS16949,Mill Test Certificate EN10204/3.1B 
3) O.D: 1/2"-4"(19.05mm-114.3mm, NB10-NB100) 
4) W.T:2mm-14mm 
5) Max length:16m 
6) Package:bare packing/bundle packing/crate packing/wooden protection at the both sides of tubes 
(Surface treatment:Oiled, black painted, shot blasted, hot dipped galvanized or phosphate coating) 
7)Third party inspection: BV, SGS, Lloyds 
8) Capacity:3500ton/month 
9)Delivery: FOB / CFR / CIF 
Delivery Lead Time: 30-60days 
10)Payment: TT 30% or 100% Irrevocable LC at sight

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now