PLC control DC driving corrugated fin welding machine, transformer manufacturing machinery
Negotiable /Set
Min.Order:1 Set
1300X400 Automatic corrugated fin welding machine for power transformer
PLC control system corrugated fin forming machine, transfomer manufacturing machinery
35-30MPA hydraulic station corrugated fin forming, transfomer manufacturing machinery
Complete radiator production line for transfomer radiator manufacturing and assembling
5.5KW Motor Power Double Layer Roll Forming Machine PLC Panasonic
Radiator Panel Production Line, Transformer Manufacturing Machinery
1300X400 Corrugated Fin Welding Machine
Corrugated Fin Forming Machine for making transformer tank
Used for making fin radiator for transformer corrugated tank.
Main technical paramter
1. width of raw steel coil: 300-1300mm
2. steel thickness 1-1.5mm
3. fin height 100-400mm
4. fin distance: 45-80mm
5. decoiler: mechanical expansion, capacity 5 tons
6. hydraulic station, 35-30MPA
7. PLC control system Mitsubishi brand
8. working speed: 3 fins/min
9. forming machine size: 5.5m x 1.6m x 2.2m
Working flow of the machine
uncoiling -- coil feeding -- plate folding -- cutting -- run-out
Fin pitch and fin height should be manually adjusted limit switches. Fin quantity can be preset in the PLC.
Main components of transformer corrugated fin machine
1. Decoiler: mechanical expansion, passive, capacity 5T.
2. Hydraulic station: max. pressure 21MPa, max. flux 40L/min, pump motor 15kW; main hydraulic components are from Taiwan.
3. Main forming unit: hydraulic driven, automatic forming.
4. Shearing device: hydraulic driven to cut formed fins.
5. Run-out table: manual, 1.5m long.
6. PLC control system: PLC is SIEMENS, touch screen, electric components are Schneider brand
Seaworthy export standard packing for the machine. All machine parts are well fastened and fixed by blocks and wire ropes. Normally one machine needs one 20 feet container for shipping.
We can provide you not only good quality transformer corrugated tank machines but also good after-sale service.
1. Machine installation & commissioning, training:
1 technician will be dispatched to Buyer’s plant for installation & commissioning. Work period: in 5 days
The expense of round trip tickets, accommodation, safety and interpretation shall be covered by Buyer, additional pay allowance to the technicians.
2. Warranty: one year
3. Price basis: FOB or CNF or CIF