Prefabricated Warehouse Building
Negotiable /Set
Min.Order:1 Set
Product Abstract:
Column And Beam Are Made Of Welded Painting H Steel Beam. Purlin Is Painting Or Galvanized C Channel Beam. Wall And Roof Are Made Of Metal Steel Sheet Or Sandwich Panel. Door Is Electric Shutter Door Or Flat Open Door. Window Is PVC Or Aluminum Window.
Prefabricated Warehouse Building Clear Span, Colorful Metal Cladding With Welded Various Of H Steel Beam. Welcome To Visit Our Convenient Portal Prefab Structural Steel Workshop. Our Goods Had Been Exported To More Than Thirty Countries.
1 The sturdy foundation is strong support of the powerful house. For a large steel structure workshop, the stability of the foundation is the top priority. Technical department of our company will be specifically designed high-performance stable foundations for the workshop you need. Engineers design basis and foundation plans diagram. Conventional foundation construction process is as follows.
2 Column is welded H-beam or national standard H-beam. Leung is welded H-beam. We will design security model columns and beams which meet automatic traction requirements ofthe structure according to local climatic conditions and the specific requirements. Construction workers erect beams that have bolted with the helpof cranes. And people waiting on the steel column can use bolts and nuts to connect the column and beam.
3 Our factory own production of varioustypes of C-beam is used as roof purlins and wall purlins of the steel structure warehouse. On the roof, C-beam bolts is fixed onpurlin pallet of the beam with bolts. Its function is a fixed roof panels. On the wall, C-beam bolts is fixed on purlin pallet of the steel column with bolts. Its function is a fixed wall panels.Purlin Pitch is usually placed at about 1.5 m. This design not only meet safe requirements, but also maximize the cost reduction.
4 Rock wool composite panels and glass cotton composite panels connect each other in hidden overlapping. Lap joints will have a bent piece to buckle which played waterproof and tightness. Wall panelsare based on the pluggable whose installation is quick and easy.
5 The Door is Sliding sandwich panel door or metal door. The window is PVC or aluminum window.Or other material windows and doors you want.You can be assured. We have a long-term collaboration supplier .The doors and windows we supply are all high quality.
6 Production period is 25-45 days after receiptof advance payment.We will provide installation drawings,installation video. If necessary, we will have dedicated staffs andengineers to the scene to guide the installation.Steel structure warehouse can be used in storehouses,food processing plants, manufacturing plants, auto 4S shops, etc. It can be divided into whether with skylights, whether with cranes.
7 Our company has always been exported from Tianjin Port. Loading and unloading of our products are convenient. There are two packages in 1*40’HQcontainer. Each package has two strong rails and four wheels. You can use crane in the destination, two people can discharge whole products within half an hour. And definitely won't destroy packaging.
8 We have a professional team to do the inspection .The goods will be shipped,so must be high quality.
The maintenance of steel corrosion: Removerust, times paint.
Weld maintenance: repair welding or remove heavy welding.
Bolt maintenance: fastening or replace news
We have made Nigeria certification, ISO9001 certification, CE certification.