Steel Buildings And Structures
Negotiable /Set
Min.Order:1 Set
Column And Beam Are Made Of Welded Painting H Steel Beam. Purlin Is Painting Or Galvanized C Channel Beam. Wall And Roof Are Made Of Metal Steel Sheet Or Sandwich Panel. Door Is Electric Shutter Door Or Flat Open Door. Window Is PVC Or Aluminum Window.
Metal building construction for sale with the high-strength bolts.Steel structure warehouse is made from welding H section steel as column and beam,painting or galvanized C section steel as wall purlin and roof purlin, some of them has crane beam, it’s made from H steel beam too. Its wall and roof are made of metal steel sheet or sandwich panel. The door is electric shutter dooror flat open door. Window is pvc or aluminum window. With the extensive use of steel structure,its advantages are increasingly significant compared with traditional building.
The advantages of steel structure buildings
1. Steel buildings are longlasting. They are stronger and moredurable than wood-framed buildings, being rot, fire and termite resistant.
2.They are Low-Maintenance. Steel Buildings are easier to maintain and clean than structures made of wood or brick.
3.Need your building quickly? Steel buildings offer fast construction and assembly.
4.They are cheaper and more reliablethan other traditional buildings.
5.They are easy to expand being built with future expansion inmind. If more space is needed, metalwalls and framework built into each steel building are simple to remove foreasy additions to an existing steel building.
6.They are energy efficient. With aproperly insulated metal building you can
save money on heating and cooling costs.
The details of steel structure buildings
1 The sturdy foundation is strongsupport of the powerful house. For a large steel structure workshop, thestability of the foundation is the top priority. Technical department of our company will be specifically designed high-performance stablefoundations for the workshop you need. Engineers design basis and foundationplans diagram. Conventional foundation construction process is asfollows.
2 Column is welded H-beam ornational standard H-beam. Leung is welded H-beam. We will design security modelcolumns and beams which meet automatic traction requirements of the structure according to local climatic conditions and the specificrequirements. Construction workers erect beams that have bolted with the help of cranes. And people waiting on the steel column can use bolts and nuts toconnect the column and beam.
3 Our factory own production ofvarious types of C-beam is used as roof purlins and wall purlins of thesteel structure warehouse. On the roof, C-beam bolts is fixed on purlin palletof the beam with bolts. Its function is a fixed roof panels. On the wall,C-beam bolts is fixed on purlin pallet of the steel column with bolts. Itsfunction is a fixed wall panels. Purlin Pitch is usually placed at about 1.5 m.This design not only meet safe requirements, but also maximize the cost reduction
4 Rock wool composite panels andglass cotton composite panels connect each otherin hidden over lapping. Lap joints will have a bent piece to buckle whichplayed waterproof and tightness. Wall panels are based on the pluggablewhose installation is quick and easy.
5 The Door is Sliding sandwich paneldoor or metal door. The window is PVC or aluminum window. Or other materialwindows and doors you want. You can be assured. We have a long-termcollaboration supplier .The doors and windows we supply are all high quality.
6 Production period is 25-45 daysafter receipt of advance payment. We will provide installation drawings,installation video. If necessary, we will have dedicated staffs and engineersto the scene to guide the installation. Steel structure warehouse can be usedin storehouses, food processing plants, manufacturing plants, auto 4S shops,etc. It can be divided into whether with skylights, whether with cranes.
7 Our company has always been exported from Tianjin Port. Loading and unloading of our products areconvenient. There are two packages in 1*40’HQ container. Each package has twostrong rails and four wheels. You can use crane in the destination, two peoplecan discharge whole products within half an hour. Anddefinitely won't destroy packaging.
8 We have a professional team to do the inspection .
The goods will be shipped, so must behigh quality.
The maintenance of steel corrosion: Remove rust, times paint. Weld maintenance: repair welding or remove heavy welding. Bolt maintenance: fastening or replace news
Contact US:
E-mail:heibeibaofeng1@gmail.com