Brass / Copper 5 Axis CNC Milling Parts with Anodizing / Sand Blasting
Negotiable /Square Meter
Min.Order:1 Square Meter
Alloy 4 Axis CNC Milling , 0.006mm Tolorance , Aeromodelling / Art-tech
High Precision 4 Axis CNC Milling Machining Service for Model Airplane
Steel / Alloy Precision Machined Parts With Quenching and Tempering
Alloy Precision Machined Parts with CNC Milling for Automation Machine Parts
Trustworthy Precision CNC Milling Parts for Automation Equipment Parts
Automotive High Precision Machined Parts , Cnc Aluminum Milling Components
Brass / Copper 5 Axis CNC Milling Parts with Anodizing / Sand Blasting
Our Slogans:
Precision parts processing, mold design and manufacturing,
professional services, customer first!
As long as you provide drawings, we can give you perfect products.
We can help you save time and money, contact us quickly,COME ON!
How to contact us?
Send your inquiry detail in the below for free sample,click “Contact Now”!
Quick Detail:
Name |
die casting parts |
Brand Name |
HSJ |
Finish |
Powder Coating/ Electroplating/ Sand Blast |
Material |
stainless steel |
Factory History |
8years |
Certificate |
ISO |
Description:
Applications
Apply for Auto parts, machinery parts, household parts, light parts, Cooker parts, furniture parts, etc
Specifications:
1) (material) |
Carbon steel, Aluminum, Alloy steel, Copper, etc |
2) Surface treatment: |
Zinc plating, Anodization, Chemical fim, Powder, Passivation,etc. |
3) Supplying range |
Shafts, Sleeves, Rings, Cylinders, Blocks, Modules etc |
4)Process |
Casting& Precision Machining |
5) Drawing format: |
pdf/.dwg/.igs./.stp/x_t. etc |
6) Production capability |
200 Tons per month |
7) Inspeciton |
100% inspect,QA,OQC,FQC,IPQC |
8) Standards |
GB, JIS, AISI, SAE, ASTM/ASME, EN, DIN |
9) delivery time |
15-20 days after receive despoit |
10) delivery place |
shenzhen |
FAQ---
(1). Question---Are you a trading company or factory?
Answer-----We have our own factory.
(2). Question---What`s the production capacity of your company?
Answer---Normally we can reach 200, 000 pcs annually.
(3). Question---How about the delivery time?
Answer---The delivery time will be according to the part quantity, usually the sample will need 7-10 days, and part production will need 25-30 days.
(4). Question---What`s the scrap rate of the part?
Answer---Normally the scrap rate is 3%~4%. However, rejected part will not be delivered to our customers, every item will be 100% inspected by our QC department before shipment.
(5). Question---What should we do if we receive defective product?
Answer---If you have received any unqualified part, please show us the pictures, our engineers and QC department will follow up and repair or redo within 10~15 days according to the rejected quantities.
Thanks for your kind attention, looking forward to your inquiry and we ensure tip top quality products with the best lead-time being provide.