PE Plastic Pipe Making Machine / Production Line For Spiral Wrapping Band
USD $35 - $35 /Set
Min.Order:1 Set
PP , PE Plastic Single Wall Corrugated Pipe Machine / Extrusion Line
HDPE Double Wall Corrugated Pipe Production Line For Plastic Extrusion Pipes
Double Pipe / Four Pipe Plastic PVC Pipe Extrusion Line For Electrical Wire
Full Automatic Rigid PVC Pipe Extrusion Line SJ-80 / 156 High Capacity Extruder
PE / PP / ABS Plastic Board Production Line , Single Screw Extruder SJ-150
PVC Plastic Board Production Line / Making Machine , Thickness 5mm - 30mm
PE Plastic Pipe Extrusion Line / Production Line For Spiral Wrapping Band
Quick Detail:
PE spiral wrapping band production line
imported electrical parts Reliable electrical and mechanical parts with long lifespan Exported to Italy and other European countries, being patent and certificated. Various pipe diameterDescription:
We exported this PE wrapping band production line for spiral sheath pipe with PLC to Italy and European countries, and have been patent and certificated.
1). This PE Wrapping band production line is mainly composed of:
1.1 |
Single screw extruder |
1.2 |
Extrusion die & spiral molds |
1.3 |
Calibrating mold |
1.4 |
Spiral forming machine |
1.5 |
Spiral haul off |
1.6 |
Spiral cutter |
1.7 |
Spiral winder |
1.8 |
Electrical control system with PLC |
2) Guarantee:
We will realize guarantee of repair; replacement and refund of substandard products within one year after the machine arrived in customer’s factory (except destroyed by buyers’ wrong operation). We guarantee the material of screw &barrel (guarantee without normal abrasion). And half a year for electric parts. Fittings of the machine will supply at preferential price after one year.
3) After-sale service, technology and installation:
(1)the supplier provide service manual and maintenance instruction of main electric appliances, limb, usage manual of equipment. We also supply water, electricity, gas of equipment and installation drawing.
(2)the supplier is responsible for installation, debugging and training, but the round air tickets, insurance, eating, housing and every day 50 USD for each engineer will be borne by the buyers. we will realize guarantee of repair; replacement and refund of substandard products within one year after the machine leaves factory. And half a year for electric parts. Fittings of the machine will be supplied at preferential price after one year.
Competitive Advantage:
1.We supply all the technical support,such as engineers,drawings,and instruction manual.
2.We send one or more than one engineers to client for installing and adjust all the machinery
3.Buyer also can sent workers to our workshop for learning how to conduct Plastic extruder
4.Supply formula guide service and staple raw material purchase.
5.We could supply the Feasibility Analysis Report for the project.
6.We could supply turnkey project to you.