Product Details
Model: JD-2000 (Finish) JD-D10 (Primer)Maydos 1MM Epoxy Self-leveling Floor PaintDescription:Maydos JD2000 Epoxy Self-leveling Flooring System is two-component solvent-free epoxy paint, it is beautiful, dust-resistant, corrosion-resistant and easy to clean.The flooring system has good bonding with the solid base, good abrasion resistanceand durability. Meanwhile, it has certain toughness, brittle-resistance andthe load of a certain weight. The compressive strength and impact resistanceability is excellent. Advantages of Finish (Topcoat):1. The surface of the Self-leveling coat is as smooth as the mirror.2. Seamless, non-dusty and easy to clean.3. Solvent-free and environmental.4. Close-grained surface has good corrosion-resistance to various chemicals.5. Has a large range of colors for the customer's reference.Where to Use:It can be applied in the non-dusty and non-bacteria areas like pharmacy factory,hospital, Precision Machinery, electronic factory, etc. Technical Data:Drying Time:Touch dry: 2 hoursHard dry: 2 daysCompressive Strength (Mpa): 68Impact resistance strength (Kg.cm): 65 Adhesive force grade: 1Pencil Hardness (H): 3Abrasion resistance(750g/1000r, g): less than 0.03Resistance to engine oil, diesel oil for 60 days: no change.Resistance to 20% sulfuric acid for 20 days: no changeResistance to 20% Sodium hydroxide for 30 days: no changeResistance to toluene, ethanol for 60 days: no changeService Life: 8 yearsShelf Life: 6 monthsApplication Procedure:1. Substrate preparation: Cleaning up and polishing the surface to remove floatingpulp. The surface must be clean, dry and leveled up.2. Primer: Apply JD-D10 epoxy high-solid primer by roller. The primer must be evenand exhaustive. The primer should be stirred evenly according to the mixing ratio,then applied directly. The quantity of the builders can be decided as per thesquare meters of the area. Using roller and waiting for 8 hours to constructthe next process. Inspection standards for the primer: even film with certain brightness.3. Putty: Fine grinding by 325# sand paper and ash removal, mixing JD-D10 with appropriate amorphous silica and apply directly with drawknife. The quantity of thebuilders can be decided as per the square meters of the area. Waiting for 12 hoursto construct the next process.Inspection standards for the putty: Non-sticky to hand, no softening, no nail printif scratching on the surface.4. Sealer: Fine grinding and ash removal. Apply a layer of JD-2000A as the sealer.5. Finish: Apply JD-2000A epoxy self-leveling finish, using the gear roller to defoamduring application. Inspection standards for the putty: even film, no bubbling,uniform color and good scratch resistance.6. Maintenance: 5-7 days. Don't use or wash by water and other chemicals.
producing area:China
supplying capacity:60000MT