Projector Aluminum Heatsink Finned Heat Sink Electronic Heat Sinks
Negotiable /Piece
Min.Order:1 Piece
LiFong(HK) Industrial Co.,Limited
Small Power Aluminum Fin Copper Pipe Heat Sink For Projector
Bowl Shape Aluminum Stamping Parts Of Fin-Heat Sink For Computer
High Precision Pure Copper Pipe Heat Sink For Projector 100mm * 50mm
High Precision Aluminium Die Casting Components Led Light Housing Aluminum For PAR38
Polish And Short Blasting Aluminium Die Castings Parts For Medical Equipment
Big Power Copper Pipe Aluminum Fin Heat Sink For Projector
Quick Details:
Precision Copper Pipe Heat SInk
Large Image: Aluminum Fin Heat Sink with Copper Pipe
Materials: Pure Copper C1100 Strips, Purity over 99.5%
Depend on customer\'s requirements
Description:
Large Image: Aluminum Fin Heat Sink with Copper Pipe
150W Big Power Copper Pipe Heat Sink
Copper Pipe Heat Sink for Projector
Heat Sink With Copper Pipe For Projector
Application:
Projector
Specification:
Overall Dimension | Fins: L80*W31 |
Aluminum Fin Thickness | 0.4mm |
Fin Quantity Per Row | 26 pcs |
Aluminum Block Size | 95*60*12mm |
Copper Tube | 8mm in Dia. |
Tube Quantity | 3 pcs |
Part Weight | 330Gram |
Material |
Pure Copper C1100 Strips, Purity over 99.5% (Standard: JIS H3250-2006); Pure Aluminum Board A1060 Purity Over 99.6% .(Standard: GB/T3880-2006). (Little Impurity brings very good Electrical and Heat Conduction; Excellent Performance In Corrosion Resistant as well.) |
Facility:
Stamping
Automatic Tube Forming Machining
Overflow Welding/Drying Machine
Processing Technic:
1. Copper Fins: Progressive Die Stamping
2. Aluminum Board: Extrusion+ CNC Machining
3. Copper Tube Forming : Automatic Tube Bending+ Burn into Tip Ends.
4. Aluminum Board and Enclosure Nickle Plated, Copper Fin Passivate (Insulation,
Oxidation and Corrosion Resistance).
5. Assembly: Automatic Fin Wearing/Assembly, then Fixed by Overflow Soldering and
Screw/Rivet Combination.
6. Quality Check
7. Packing
Advantages:
1. Professional Research and Design Team, Strong & Automatic Equipments: Progressive Stamping, Automatic Tube Bending Machine, Automatic Fin Wearing Machining
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication