High recovery rate Gold machine/Gold mining equipment/Gold washing plant
USD $30000000 - $30000000 /Set
Min.Order:1 Set
River Gold Mining Equipment / Gold Trommel Washing Plant / Gold Magnetic Separator Machine For Sale
High Efficient Magnetic Separator Gold Mining Equipment With Long Working Life
aac block machine/aac block plant/autoclaved aerated concrete block line
AAC block production machine line,Aerated autoclaved concrete block machine line
China machine manufacturer autoclaved aerated concrete machine
One kind of gold beneficiation process takes two closed half a broken, two second closed-circuit grinding, and then optimization of flotation, featured. And its tailings is the election of a rough one other operation, and featured concentrate tailings and swept the election are mixed together to regrinding re-election with original ore. So this process has high broken effective.
The fine-grained level in final broken product is over 81.55%. Its breaking capacity is great that is 53.84 ton per hour. It has short working time, effective sorting and technical indicators for the high that can improve ore-dressing recovery and concentrate grade at the same time. Recovery ratio is improved by 3.03%, and concentrate grade is improved by 16.57 g/t, and power is reduced 21.5%, and the cost is reduced by 18.9%. And the annual economic efficiency is added by 8.6012 million Yuan.