DIN2440 , BS3604 ERW Mild Carbon Steel Pipe / ERW Tubes 4 Schedule 40 For Fitness Equipment

DIN2440 , BS3604 ERW Mild Carbon Steel Pipe / ERW Tubes 4 Schedule 40 For Fitness Equipment

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
0 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
XQS
Place of Origin:
China
Model Number:
ERW56

Tianjin xuanqusheng international Co.,Ltd

Business Type: Trading Company
Tianjin China
Main Products: Welded Steel Pipe ,ERW Steel Pipe ,Steel Hollow Section

Product Details

Delivery Time:15-20 days after receiving 30%T/T Deposit or L/C At Sight.
Certification:ISO9001,ISO14001,BV,SGS

DIN2440 , BS3604 ERW Mild Carbon Steel Pipe / ERW Tubes  4 Schedule 40 For Fitness Equipment

Quick Detail:

Round Welded Steel Pipe / Tube , Welded Steel Pipe /Tube   

Round Hollow Section ERW Steel Pipe /Tube , ERW Tubing       

Outer Diameter/O.D/mm

21-340

Wall Thickness/W.T/mm

1.0-16

Section Shape

Round

Standard

ASTM A53, API5L GR.B, DIN2440,GB,BS3604,DIN EN10219

Grade

Q195-Q345/S235/S275/S355/16Mn/20#/45#/20MN2/SS41/A36/A35/ST37/ST35

Special Pipe

Thick Wall Pipe

Big Outer Diameter

Type

Welded

Welded Line Type

Longitudinal 

Alloy Or Not

Non-alloy

Secondary Or Not

Non-secondary

Specifications :

We are the manufacturer of steel pipe/tube and steel coils. Supply high quality various sizes products, the cheapest price and the best service for you. The list size we often produce for your reference.We also always have the huge ready stock for sell.

Product

DIN2440 , BS3604 ERW Mild Carbon Steel Pipe / ERW Tubes  4 Schedule 40 For Fitness Equipment

O.D/mm

21-33

33-60

60-89

89-114

114-140

140-165

165-219

219-273

273-325

325-340

W.T/mm

1.0-3.5

1.0-4.0

1.2-4.0

1.4-4.5

1.6-4.8

2.0-5.0

2.5-6.0

2.75-8.5

3.0-15.0

3.0-16.0

Length/m

5.8-11.8 or According Customers’ Requirements

End Treatment

Plain/Beveled/Thread with Sockets/Flange/Coupling and Plastic

Material

Q195,Q195L,Q235,Q345B,ST37, ST35, A36, A53,SS41

Surface 

Treatment

Varnish painted on pipe (black painting), anti-corrosion oil and insulation treatment,

 galvanized or painting as customer\'s request.

Inspection

Hydraulic testing, Eddy current, Infrared test.

Package

1. Packed by Steel strips.(Small O.D)

2. Water-proof Cloth Covered with Tarpaulin.

3. In Bulk(Big O.D)

4. According to Customers’ Requirements.

Lead Time

15-20 days after receiving 30%T/T Deposit or L/C At Sight.

Price

Get the Latest Price

Payment Term

T/T  L/Cat sight  Western Union

MOQ

20 Ton/Tons

Contact Supplier

Wr.Wang sale Manager Chat Now
Telephone
86-022-68729310
Mobile
86-13821888995
Fax
86-022-68729307
Skype
info
Address
North Technology Road , Cuijiazhuang Village , Daqiuzhuang Town, Jinghai County , Tianjin , China Baoji,Shaanxi

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Service Equipment > Cargo & Storage Equipment
Categories
Hi~