iron and gold extracting equipment
Negotiable /Set
Min.Order:1 Set
1. this equipment use conveyor belt or artificial feeding, first through magnetic iron powder extraction, and then move into the drum chute elected.
2. equipment maximum capacity of 50-60 tons per hour.
3. the equipment has simple structure, low maintenance.