Steel mill foundry 5 ton overhead bridge construction cranes lifting systems
Negotiable /Meter
Min.Order:1 Meter
Ningbo Dalishi Crane Lifting Machinery Co.,Ltd
2 - 40 Ton 9m Double Girder Bridge overhead Simens electrical crane systems
600v A3 24m 1 - 20t Monorail single beam bridge crane system components
light weight 18m 16t LX model suspension overhead bridge crane systems
6 - 30m One beam overhead bridge beam crane lifter equipments with Electric wire rope
A3 - A5 1 ton 6m LDA Type Single Girder Bridge Overhead Cranes systems
SGS heavy duty double beams electrical bridge Gantry Hoist crane 50 ton
Steel mill foundry 5 ton overhead bridge construction cranes lifting systems
1.Perfect safty system and alarm
2.Cabin control,PLC design available
3.Forever technical support
4.Turnkey project supply
Steel mill foundry crane,
ladle crane,
casting crane,
teeming ladle crane,
EOT crane
QDY YZ -S
HIGH AMBIENT TEMPERATURES
HIGH LEVEL OF AVAILABILITY
SEVERE OPERATING CONDITIONS
LOW-MAINTENANCE DESIGNS WITH A LONG SERVICE LIFE
SAFETY HOIST UNITS
REDUNDANT DRIVE SYSTEMS
Special usage:
This kind of crane is mainly used in BOF bay, EAF bay and CCP bay in steel smelting shop.
1. QDY Model Ladle Crane,Foundry Overhead Crane,Casting Overhead Crane are mainly used at the place where the molten metal is lifted. Wide use in steel plant, smelting workshop,metallurgy plant.
2.The working calss of the complete machine is A7,A8
3. Working temperature:-10~60’C
4.Thermal-protective coating is added at the bottom of the main girder.
5.The assembling and test of the crane comform to the document No.ZJBT[2007] 375 which was issued by General Administration of Quality Supervision,Inspection and Quarantine of The People’s Republic of China. The place where molten nonmetal material and red-hot solid metal is lifted also can refer to ths document.
6.Soft starting and stopping,smooth running
7.High working efficiency, commfortable and safe operation
8.Low maintenance,low cost mainteannce
Equipment and structure
Normally there are four beams and two trolleys assembled on the crane, laminated ladle hook is equipped on the main trolley for lifting the ladle, and Aux trolley is for overturning the ladle and other assistant handing. The electrical appliance is installed inside of the main girder with heat insulation device and cooling device, the crane can work efficiently under harsh conditions such as high temperature and dust-laden
Factory-SFactory -S
Steel mill foundry crane,ladle crane,casting crane,teeming ladle crane,EOT crane Steel mill foundry crane,ladle crane,casting crane,teeming ladle crane,EOT crane