Introduction:
Sites Applicable
Stadium,Arena,Gym,Conference Hall,Exhibittion Center
Specifications
Backrest:
No backrest, Use HDPE as raw material, adopt blow molding craft.
Drainage:
Scupper design, no (seeper) because of rainwater.
Stanchion:
Use high quality steel tube molding or aluminum precision die-casting, surface
phosphated,electrostatic gush model form.
Installation:
Floor mount,Riser mount.
Pass ISO9001:2000 Quality System
Pass ISO12001:2004 Quality System
Pass fire resistance, and anti-UV and anti-aging tests by SGS
Pass BS 7176:2007 fire resistance tests by TUV
pass EN 13200-5:2006 test
Our projects including:
2008 Beijing Olympic Games
2010 China Shanghai EXPO
2007-2012 F1 Singapore
2010 F1 Korea
2011 Universiade Shenzhen(exclusive seating supplier)
2013 China Tianjin East Asian Games