Model No.: Product Origin:China Brand Name:Powerlink Price Terms: Payment Terms: Certification: Description:Product Name: Parallel Control Panel BoxPlace of Origin: ChinaFeatures:
1) Paralleling conditions:
a) Generator sets should be equipped with electrical governor system
b) Incoming genset phase sequence must be same as grids
c) Voltage difference is in the limitation between genset and grid
d) Frequency difference is in the limitation between genset and grid
e) Phase angle difference is in the limitation between genset and grid
2) Better reliability and continuity of electrical power: the paralleling of
generator sets enhance system performance because they can bear much
more load than one genset's load
3) Maintenance and service convenience: with generator sets operated in
paralleling system, servicing generator sets will not interrupt emergency
power to destroy system
4) More economic: operator can manage the operating gensets according to
grid load. It eliminates the waste of fuel and lubrication oil while bigger power
genset carrying smaller load
5) More flexibility for future expansion: paralleling system offer economic installing
only as much power as you need, then adding generator set when building
power expanding
Packing:
With shrink wrap and/or wooden box