muff coupling/hdpe to steel pipe coupling / 5" Casing Coupling
USD $10 - $50 /Piece
Min.Order:1 Piece
Tianjin Dalipu Oil Country Tubular Goods Co., Ltd
Packaging Details:By carton, wooden case, wooden pallet, or by requirements of customer.
Delivery Time:Shipped in 10 days after payment
muff coupling/hdpe to steel pipe coupling / 5" Casing Coupling
Product Name | muff coupling/hdpe to steel pipe coupling / 5" Casing Coupling |
Standard | API 5CT &API 5B |
Grade | J55,K55,N80,L80,C90,T95,P110; |
Place of Origin | Tianjin China |
Outer Diameter | STC141.30mm/LTC141.30mm/BTC141.30mm |
Minimum Length | STC165.10mm/LTC196.85mm/BTC231.78mm |
Weight(kg) | STC4.66/LTC5.75/BTC5.85 |
Techniques | Machining |
Head code | Round |
Thread Type | NUE,EUE,STC,LTC,BTC. |
Serial Number | Name | Specfication and Type | Applied Location |
1 | Raw Material Inspectioon Device | Ulterasonic Detector | Operation Inspecting and Measuring Line |
2 | Hydraulic Tester | PPT-80 80Mpa | Hydrostatic Processing Teat in Line |
3 | Ultrasonic Pachometer | HCH-2000C | Material Inspection |
4 | Magnetic D Detector | EMW-4000 | Coupling Inspecting in Line |
5 | Coating Pachometer | TT-260 | Bonderizing Inspection |
We will choose the suitable packing for different goods, protect the safety of goods and help customer to design the economical shipping plan at same time.
Packaging Details:By carton, wooden case, wooden pallet, or by requirements of customer.
Delivery Detail:Shipped in 5 days after payment
TIANJIN DALIPU OIL COUNTRY TUBULAR GOODS CO.,LTD is a modern professional industry and trade combined enterprise specializing in producing and trading seamless steel pipes.
The main products of our company are the oil casings and oil pipelines. We not only supply our goods with many large oil fields, but also establish a long-term business relationship with the Middle East Europe, Africa and other countries around the world and co-operative very well.
FAQ
Q: How long is your delivery time?
A: If there are stocks, take 5-10days to delivery for small quantity, and 30-40days for bigger quantity;If no stock, depends on the steel billet purchase,
Q: What about your payment term?
A: Usually T/T or L/C, 30% deposit and 70% before delivery.
Q: what about your standard delivery date
A: 30 days after receiving deposit .We are pleased to provide you with best services in consulting, purchasing,transportation, installation, and after-sales services.
We would like to establish long term business with any reliable partner in the world . Any interesting or questions, pls don't hesitate to contace us . Waiting for your kindly reply . Thanks