Plastic moulds
Negotiable /Set
Min.Order:1 Set
Dongguan Yizhan Hardware Ribbon Factory
Plastic mould
1) Plastic mould for automotive parts, electrical parts, communication parts etc
2) Dimension/size: Custom-made according to your requirements
3) We manufacturing precision plastic mould, insert mould, and producing also precision communications products/parts
4) We build up new mould according to your product samples, engineering drawing(autocad, UG, ProE, etc) and engineering specifications
5) Mould, plastic mould, insert moulding etc
Plastic Mould
Material | 45#, 50#, P20, H13, 718, NAK80, S136, SKD61, etc |
Mold Life | 1,000,000 shots |
Mold Base | LKM, HASCO, etc |
Mold Design | According to engineering Drawing or Sample |
Cavity | Single or Multiple cavity |
Runner | Hot or Cold |
Lead Time | 15 ~ 22 days |
Packing | Wooden Case |
Place of Origin | Dongguan, China |
Advantage | Pass ISO9001 Quality System Attestation Advanced equipment and excellent R&D Team Highly skilled manufacturing process Strict quality Control System High quality, punctual delivery time and competitive price are our goal. |
Plastic Part
Material | ABS, AS, PPS, PP, POM, PC, PA, PMMA, PS, HDPE, TPE, TPU, TPR |
Products range | housings, toys, food packing and containers, plastic gifts, health care devices , electronics , home appliances, medical device industry etc. |
Lead Time | 1~2wks |
Packing | Outer packing: Carton Inner packing: plastic bag |
Mass production | Provide production samples for your confirmation before mass production and mass production will be supervised all the time. |
Advantage | ISO 9001 system and 10 years export experience in this line. |
We are professional manufacturer in mould making and metal stamping die, has many years of experience in mold
manufacturing, product sales at home and abroad for several decades, clients and us work together create
a good future.
Business procedures:
1.R&D | Customer provide engineering drawing or samples for quotations |
↓ |
|
2.Negotiation | The quality, price, material, delivery time, payment item, ect. |
↓ |
|
3.Place order | According your own design or you chooses our design. |
↓ |
|
4. Tool& Die making | According customers request to build the mould, tool and die Before make the mould, we send mould design to customer approval first; Before move forward to production; we send samples to customer to confirm first. |
↓ |
|
5. Tooling sample | If the first sample come out is not satisfied customer, we modify the mould/tool until meet customers' satisfaction |
↓ |
|
6.Mass production | If your quantity is beyond our storage, we will provide lead time to you. |
↓ |
|
7. Shipping | Delivery goods by sea or by air, according customers requirement. |