NEW innovator 11KW JIEDA ultrasonic plastic bag making machine
Negotiable /Set
Min.Order:1 Set
Dongguan Jieda Ultrasonic Equipment Technology Co., Ltd.
new innovator 11kw JIEDA ultrasonic plastic bag machine
JIEDA ultrasonic equipment technology CO,LTD. specializes in research, development, design, production, to sale difference kinds of ultrasonic machine, like nonwoven fabric terminal equipment and other machinery terminal equipment, welding machine and so on.
1. Features of plastic bag making machine:
(1) The machine is a kind of advanced bag making machinery.
(2) Has the microcomputer control system, servo motor control.
(3) Adopts photo cell trace, controlled by computer, automatic control chain bone stick, with a white bag and color bag conversion system, automatic counting, to several alarm, automatic temperature control, fault alarm downtime system.
(4) The machine is equipped with ultrasonic automatic welding machines and heat transfer automatic welding, automatic paste bone device, automatic punching, etc.
(5) The machine adopts an assembly line, automation programming, is making towel bag, socks bags, fruit bags, inside the pocket of ideal equipments.
2. Technical Parameters:
Model | JD-PP1000 |
Host power | 1.5KW |
Stepper motor power | 3KW |
Feeding motor power | 800W |
Add hot power | 3KW |
Ultrasonic power | 1.8kw |
Max cutting width | 999mm |
Film thickness | 0.01-0.05mm |
Speed of Bag-making | 80-120pcs/min |
Total power | 11kw |
Overall size | 9200*3100*2200mm |
Weight | 3200kg |
our machine packaging with plywood box and plastic films,the delivery is common about 7-35 days.
our warantty is one year,and lifetime maintenance.
our advantage:
1. We have our own factory and professional designers. We can manufacture what you need with competitive price totally as your requests;
2. Our company provides before-sales, in-sales and after-sales services with heart and soul in equipmet design and engineering construction.
A:Yes,we are the factory.
Q:How long is your delivery time?
A: Genery it is 3-10 days if the goods are in stock,or it is 7-35days if the goods are not in stock,it according to the quantity.