ABS resin(Acrylonitrile Butadiene-Styrene) Production line
USD $10,000 - $170,000 /Set
Min.Order:1 Set
Laizhou Yuanda Chemical Industry Machinery Factory
ABS resin (Acrylonitrile Butadiene-Styrene) production line
product information
*complete resin making plant:
reaction vessel
dilute kettle
horizontal condenser
fractional column
oil-water separater
buffer tank
vacuum pump
*Application:PU resin,Unsaturated Polyester Resin,Alkyd Resin,Fiberglass Resin,Artificial Marble Resin,Epoxy Resin,Phenolic Resinetc.
*material:304/316 stainless steel and Q235 carbon steel.
*heating method:by electric or steam ( use bolier fuel can be nature gas,oil,coal)
*output :smallest is used for labratory before mass production about 100kg per batch,from 1 ton to 60ton can meet different requirment
experience and export:
we have do this machine produce more than 15 years,have rich experience and mature technical to design and produce this machine
export:we have export this machine to Saudi Arabia,Russia,India,Pakistan,Indonesia,etc
service:we can send engineer to help instal complete production line and guide produce
The complete production process:
1. put the material to the 5000L reactor kettle,start heating ,when the temperature reach about 100 degrees,it will produc gases,and the gas will into the separation column.
2. after part be cooled by the separation column, the rest gas into horizontal condenser,then condenser will cooling the gas ,after all the water and gas will into the catchment device.
3. the catchment device,will separate material back to reactor kettle,and exclude the water.(the process may be last about fifteen to twenty hours)
4. during the reaction process,in order to improve the speed, can extracting vacuum,when reach the suitable time, sampling, assay viscosity,if meet the requiment, then cooling.
5. when the temperature reach 130 degrees,put the raw materials to dilute kettle,and add Xylene (this kind of material) to dilute kettle, diluting , cooling ,then make the prodction you need.
We've made many successful projects for customers home and abroad.We can help customer to found plant from plant design to installation.
FAQ:
About Delivery time
Q-----What’s the delivery term for making business with us?
A-----Usually we send tne shipments in FOB term.However, the terms of CIF are acceptable which depend on the preference of clients.
About Lead Time
Q------What’s the lead time after placing thr order?
A------Usually it takes about 25~30 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
About Payment Term
Q------What’s the Payment Term?
A------By T/T in Advance, or Irrevocable L/C as Sight.
Our machines can be customized, leave an inquiry to know more details about price, packing, shiping and price.
Send your message to this supplier: