zhejiang wenling home depot centrifugal electric air blower
USD $7.7 - $12 /Piece
Min.Order:2580 Pieces
Taizhou Jiayi Electric And Machinery Co., Ltd.
CE Certification and small AC Electric Current Type air blower
Aluminum Blade Material and AC Electric Current Type Centrifugal blower
3" Electric Centrifugal blower with Aluminum housing copper coil MADE IN CHINA
factory/manufacturer 600mm 24"AC 220V industrial axial exhaust ventilator fan portable blower
Model Blower | DIAMETER (Inch) | VOLTAGE (V) | FREQUENCY (Hz) | POWER (W) | ROTATION SPEED (r/min) | VOLUME FLOW (m^3/min) | Current (A) | FAN BLADE | QTY/CTN (pcs) | N.W (kg) | G.W (kg) | Package size L*W*H (cbm) | cbm/ctn | QTY/20FT (pcs) | QTY/40HC (pcs) | ||
Blower 2" | 2 | 220 | 50 | 0.15 | 3000 | 3000 | 1 | Material: Aluminum Quantity:6 | 4 | 8.5 | 9 | 38.5 | 23.5 | 48 | 0.043 | 2579 | 6263 |
Blower 2.5" | 2.5 | 220 | 50 | 0.26 | 3000 | 3000 | 1.6 | Material: Aluminum Quantity:6 | 4 | 14 | 15 | 45 | 22.5 | 60 | 0.061 | 1844 | 4477 |
Blower 3" | 3 | 220 | 50 | 0.37 | 3000 | 3000 | 2 | Material: Aluminum Quantity:6 | 1 | 4.2 | 5 | 30 | 26.5 | 33.5 | 0.027 | 1051 | 2553 |
Blower 4" | 4 | 220 | 50 | 0.55 | 3000 | 3000 | 2.8 | Material: Aluminum Quantity:6 | 1 | 8.5 | 34 | 33.5 | 35 | 0.040 | 702 | 1706 |
White box.
Advice: Less than 1 cbm, express shipment is suggested; More than 1 cbm, sea transport is better.
1.Manufacturer or trading company:
We are a professional manufacturer specializing manufacturing various kinds of Mist Fan, Blower and Ventilation.
2.MOQ:
Total MOQ 1*20FT.
For trail order, we receive LCL, but the freight will depend on you.
3. Generally, what is the lead time?
Generally speaking , the delivery time around 25 days /20ft, 35 days/40HC.
4.Package:
We can change package if you need. Of course, the price will be calculated again.
5. Sample requirement:
Accept.
6. What is your Payment term?
Per order: T/T 30% deposite before production, 70% balance should be paid before delivery.
7.How do I know my order have been issued production?
We will start production when we receive confirmed PI & 30% deposit. Lead time will be effected from that date.
8.After receipt of goods, how to do if they have any quality problems?
You should
1. take a picture for quality problem's part.
2. note down the quality problem products quantity.
3.find the quality problem products order no.(PI no.)
Above information and your brief usage description or storage situation(if necessary),
then send an email to us, we will pass your complete information to QC department,
and get back to you within 3 working days.
Warm notice:*Incomplete information may effect our investigation schedule. *We will afford quality problem products compensation or replace quality problem products within products sales price.
NAME : Lisa Lin