small equipement for change the rail
small equipement for change the rail
small equipement for change the rail
small equipement for change the rail

small equipement for change the rail

USD $2,000 - $2,100 /Set

Min.Order:1 Set

Supply Ability:
20 Set / Sets per Month
Port:
dalian port

Quick Details View All >

Place of Origin:
Singapore
Brand Name:
Delta
Model Number:
DR-LLS-05
Lift Mechanism:
Lift Chain
Lift Drive / Actuation:
Hand
Rated Loading Capacity:
1T

Jinzhou Tiegong Railway Maintenance Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Jinzhou Liaoning China
Main Products: Railway Maintenance Equipment

Product Details

small equipement for change the rail

 small equipement for change the rail

 

The Rail Changer is a specific machine designed to lift rails with a maximum weight  of 12T.

 

 

The rail changer consists of a metal structure, and mainly comprises the following

parts (see figures below):

 

1.Frame

 

2.Roller Rail Grip

 

3.Chain Winch Force 10kN

 

4.Lifting handles

 

5.Transportation rollers

small equipement for change the rail

 

1. Frame

Periodical lubrication every 200 hours

- Adjustable legs;

- Articulation of the handles;

2. Roller Rail Grip

Periodical lubrication every 100 hours

- Rollers;

- All the pins/articulation of the rail grip;

 

3. Chain Winch Force 10kN

 

a. Slightly oil the lifting chain before first use of the equipment;

 

b. Every 200 hours oil:

 

- The lifting chain;

 

- The lifting eye and lower carrier;

 

- The single flange rollers;

 

c. Regularly check the state of the links of the chain;

 

d. Never grease the braking system crank side.

 

 

Overall Length with Lifting Arms Closed

2310 mm

Overall Length with Lifting Arms Opened

3150 mm

Height

1295 mm

Width

700 mm

Weight of the Rail to be lifted

1.0 Ton

 

SAFE OPERATION OF CHAIN BLOCK

 

1.Don’t overload your chain block.

2.Don’t step in under the load.

3.Don’t try to suspend a load with two blocks.

4.Don’t pull up too far or pull down slamming fast.

5.Don’t use the chain with a kink.

6.Don’t get the load dragged against the floor.

7.Don’t give the load a sudden take-off. Take a breath when the load chain is just taut and check for the brake action by pulling up and down about 10 cm above the floor.

 

8. Do not turn round the chain block as loaded.

 

 

COMPONENTS

 small equipement for change the rail

OVERALL DIMENSIONS OF THE EQUIPMENT

small equipement for change the rail

 

Lateral lifting handles closed

small equipement for change the rail

 

                                                                 Lateral lifting handles opened

 

 

 

Packaging & Shipping
packingstandard package of woodcases
shipping7-15 days after receiving the payment

small equipement for change the railsmall equipement for change the rail 

 

Company Information

small equipement for change the rail 

 

Contact me

small equipement for change the rail 

 

 

 

 

 

 

 

Contact Supplier

Ms. Christina Xu manager Chat Now
Telephone
86-416-7996209
Mobile
86-18341628401
Fax
86-416-7996210
Address
No.1-400 14th Level, Rui Sheng Jing Zuo Building, Jin Niang Road, Taihe District Jinzhou,Liaoning

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > General Industrial Equipment > Material Handling Equipment > Lift Tables
Categories
Hi~