Sprial Mixer Heavy Duty 200 Liter Spiral Mixer HS200SB
USD $2288 - $2517 /Unit
Min.Order:1 Unit
Guangzhou Fomachi Machinery Development Co. Ltd
Dough Mixer Heavy Duty Bowl 200 Liter Spiral Mixer HS200SB Made in FOMACHI Co. Ltd.
Spiral Mixer 200 Liter
Model Number: HS200SB
Power: 4.0/ 6.5 KW
Voltage: 380V / 50HZ
Bowl Volume: 200 Liter
Mixing Speed: 140/200 RPM/MIN
Bowl Speed: 11/16 RPM/MIN
Max Flour: 75 KG
Net Weight: 320 KG
Size:750*1350*1300 MM
Gross Weight: 350 KG
Packing Size: 830*1380* 1520 MM
Feature:
1. With safety guard;
2. Security configuration: when overload, it would stop working.
3. Belt transmission, low noise.
4. With current overload protection.
5. Double speed and bowl speed.
Different capacity Spiral Mixer for reference:
Model | HS20SB | HS30SB | HS40SB | HS80SB | HS130SB | HS200SB |
Bowl Volume | 20 Liter | 30 Liter | 40 Liter | 80 Liter | 130 Liter | 200 Liter |
Max Flour | 8 KG | 12 KG | 18 KG | 30 KG | 50 KG | 75 KG |
Mixing Speed | 220/120RPM | 220/120RPM | 220/120RPM | 220/160RPM | 200/140RPM | 200/140RPM |
Bowl Speed | 22/12RPM | 22/12RPM | 22/12RPM | 18/13RPM | 16/11RPM | 16/11RPM |
Power | 1.1 KW | 1.5 KW | 1.8 KW | 1.8 KW | 3/5 KW | 6.5 KW |
Size | 400x730x900MM | 450X800x1000MM | 470x850x1100MM | 580x1000x1050MM | 740X1350x1300MM | 750x1350x1300MM |
Voltage | 220V/50HZ | 220V/50HZ | 220V/50HZ | 3N~380V/50HZ | 3N~380V/50HZ | 3N~380V/50HZ |
Fomachi Co.’s Main Advantage:
1. Our professional experienced team would offer the perfect solution to help you solve your problem.
2. Quality certificated kitchen equipment bring the top secure and high quality to you in your kitchen.
3. Customization kitchen project is available, please contact us and offer the details, our professional engineers would offer the suitable solution to you.
4. We have professional shipping team to arrange the international shipment and express for the goods.
Fomachi Co.’s Service:
FAQ:
1. Which payment terms are acceptable?
30% deposit before production and 70% balance before shipment by T/T(Telegraphic Transfer)/Western Union.
2. What is the delivery time?
It depends on the quantity of the order and our stock. If the product in stock, it would take 5~7 days to preparation. Normally, there is not stock, it would take around 15~35 days to preparation.
3. How about is the warranty?
We guarantee all of our goods the warranty for one year.