Solar plant ground screw pile driver /hydraulic press pile driver
USD $18,000 - $40,000 /Set
Min.Order:1 Set
Shandong Hengwang Group Co., Ltd.
Product Introduction
Pile driving speed,the average 3 minutes can realize piling 6 meters deep,namely a hole 3 minutes to play.Oil province,is a common driver uses around half of a year can be a driver left money for you.Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.
Crawler walking,high walking and climbing ability The frame can be moved back and forth,bit can be adjusted,high piling position accuracy.
Technology Parameters
1 | Drilling depth | 1-3M | |
2 | Drilling diameter | 70-800 mm | |
3 | Walking speed | 5-10 km/h | |
4 | Gear pump model | 40/40 | |
5 | Hydraulic system working pressure | 20-25 Mpa | |
6 | Hydraulic system displacement | 40/40 ml/r | |
7 | Diesel engine model | Weichai4105ZD | |
8 | Power head torque | 4800 N.M | |
9 | Travel motor | China motor | |
10 | Hydraulic system | Adopt double pump valve confluence | |
11 | Machine weight | 5500 kgs | |
12 | Machine size | 4500×2000×2700mm |
PILE DRIVER PHOTOS
Customer visit our factory
Any qurstion,please feel free to contact me any time,
Skype : hw.april
QQ: 2283541257
Mobile:+8613518655765
What's app:+8613518655765
Wechat:+8613518655765
Email:hengwang02(AT)
Tel: 0086-537-2882808
Fax: 0086-537-2585538