Product Details

Stainless Steel Pipe Fitting Handrail Middle Support

Material Stainless Steel
Technics Casting
Type Elbow
Place of Origin Guangdong, China
Model Number YK-9438Stainless Steel Pipe Fitting Handrail Middle Support
Brand Name JINXIN
Connection Welding
Shape Equal
Head Code Other, Round

Product Features

Stainless Steel Pipe Fitting Handrail Middle Support   YK-9438

Stainless Steel Pipe Fitting Handrail Middle Support

 

1.Material:stainless steel 304 or 316
2.Finish:satin or mirror polish

3.Size:Support for pipe with  ø 42.4mm,50.8mm

4.Application:Handrail staircase of the apartment, balcony or deck and so on.

5.Feature: Beautiful outlook, easy to install
6.Minimum Order Quabtity:300pcs per modle
7.Payment:30~50% as deposit by T/T, other balance is paid before delivery.
8.Delivery time:Usually 15-45 days after deposit receipt. 
9..Customers designs are also available

10.Other different size is available for OEM/ODM.

 


Others  Pip Fittings For Your Choice
 

 

 

 Stainless Steel Pipe Fitting Handrail Middle Support

 

Stainless Steel Pipe Fitting Handrail Middle Support

 

 

 

Custom Made

 

Stainless Steel Pipe Fitting Handrail Middle Support

 

JINXIN Basic Information:

Quotation

FOB Guangzhou Port of China,included all packing cost except special requirement.

Material:

All products are made by stainless steel 304 and 316. 

We can offer original Material Test report for refer.

Packing Details:

Each type of product is packed in separate inner boxes.

Each outer box weight is not over 20kgs.

Packing Marks:

Each carton indicates properly the pallet number,box number and 

code number of the product it holds,material type(AISI 304/306) and inside quantity.

Delivery:

In oder to be in a position to in form the shiping agent accordingly, 

when goods are ready for shipment,we will send all details of the merchandise 

such gross and net weight,number of boxes/pallets and overall dimensions to client.

Delivery Time:

15~45 days afer receipt of advance payment.

Documents Offered:

For shipment: 

Original Bill Of Loading

Original Invoice

Original Packing List

Payment Term:

30~50% in advance as deposit. Other balance is paid before delivery and shipment.

Bank information:

 

Company:JINXIN HARDWARE PRODUCT LIMITED

Beneficiary’s A/C NO:440449559838

Bank Code:004

SWIFT Code :HSBCHKHH

 

 

 

Any question about our factory and products, welcome you contact with our staff:
--
JINXIN Decorative Hardware Products Manufactory
WEB: 
ADDRESS: Dayun Industrial Area, Pingbu Road, Shiling Town, Huadu District, Guangzhou, China.
 

 

Stainless Steel Pipe Fitting Handrail Middle Support

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now