CN8020 New modern glass top center table design
USD $99 - $160 /Piece
Min.Order:1 Piece
Foshan Congling Metal Furniture Factory
CN8020 New modern glass top center table design
Foshan Comfort Zone Metal Furniture Factory
Side Table Made By Steel With powder coating finshed
MDF tray
Dia500*H550mm
Custom-made order is accepted
e
Item No: | CN8020 | Reommend | C8014 |
Product Name | Coffee table | Brand name | Comfort Zone |
Material | 201# stainless steel, and 10 mm transparent tempered glass | ||
Packing & Transit | can NOT disassembly, poly bag,carton | Color | any color |
Size(mm) | Dia500*H550mm | Disassembly or not | No |
CBM | 0.15 m³/ctn | Packing | 1pc/2ctns |
N.W/G.W | 5kg/5.5 kg for one piece | MOQ | 10 pcs |
Period pf production | 13 days | ||
Delivery time | Within 13 days after received 30% down payment | ||
Container capacity | 20” container:186pcs 40 HQ container:453pcs |
Terms & Conditions
Delivery time | regular orders:within 13 days after received 30% down payment OEM orders: 15 days |
Output | Dining table 5000 pcs/month |
Payment terms | EXW, FOB, CFR, CIF, Express delivery |
Payment | a)T/T 30% deposit in advance, 70% balance paid before shipment. b)L/C |
Packing
Guarantee
1) All of sofa is guaranteed for 12 Months excluding wear and tear. |
2) Defective items should be found within guarantee period. |
3) Different questions will lead to different solve ways, pls contact with us individually. |
FAQ
1. Q: Are you a factory or trading company?
A: We are a factory.We produce Dining Room furniture: Dining Chairs, Dining Tables,coffee
table, tv stand, side cabinets &Living room furniture: bed, Sofa and so on.
2. Q: Where is your factory located? How can I visit there?
A: Our factory is located in 18th Xiantang Road, Longjiang Town, Shunde District, Foshan City,
Guangdong province,China. All our clients, from home or abroad, are warmly welcome to visit us!
3. Q: What is the material of your products?
A: The material is marble top and tempered glass top, stainless steel and chrome frame. We can
also choose material as customers’ requirement.
4. Q: How can I get some samples?
A: We can accept small order at the first cooperation and make production after u paying for us.
Delievery time is 10 days. U just tell me the port name and our forwarder will ship the goods to ur
port .
5. Q: How does your factory do regarding quality control?
A: "Quality is priority.''Our inspector QC will check the goods in everyprocedure and modify the
parts once they find any problems from them. For our salesmanwill also check our goods and take
photos for every procedure for our client to confirm.