Al kasrah porta cabin
USD $57 - $120 /Square Meter
Min.Order:1000 Square Meters
Weifang Henglida Steel Structure Co., Ltd.
Material list:
Item | Specification | Photos | |
Type 1 |
There are two type of prefab house, one of the main difference is that Type 2 cannot see the steel frame from the out/inner surface while Type 1 can be seen from the out surface.
Type 1 has its own standard size, please refer to the following details. Type 2 can be manufactured according to the customers’ specific requirements. | ||
Type 2 | |||
Length | Length=NK. (K=1800mm,N is awhole number equal to or any bigger than two) | ||
Widt | 5560mm,6230mm, 7360mm, 8250mm, adjust accrodlingly. | ||
Height | Width=3P,6P,or 9P(P=950mm, 3Pis one storey, 6Pis two storey and 9P is three storey.) | ||
Roof slope | Slope is 1:10 ~ 1:5 | ||
Floors | Less than 3 floors | ||
Steel frame |
Steel columns/pillars
Square steel tube(Q235) 50x50x2.0mm
Steel Truss | ||
Roof and wall panel | 50mm thickness Rock Wool insulation corrugated panel, (Alternative EPS or fiber glass) 0.4mm steel sheet,120Kg/m3 rock wool density, Heat Insulated coefficient is 0.041w/m.k. Heat transfer coefficient is 0.58w/•k. | ||
Edge cover | 0.5mm thickness color steel plate | ||
PVC window | white color, glazed with glass in a thickness of 4mm, two bay fixed and two bay sliding, with fly screen. (Alternative plastic steel frame, glass window) | ||
ceiling | 6mm thickness gypsum board or PVC board
| ||
Door | White color sandwich panel window, furnished with a cylinder lock with keys
The door can be alternated by the clients’ requirements. | ||
Floor | 1.5mm thickness PVC floor leather
18mm plywood | ||
Electric cable, PVC wire Channel |
| ||
Lights, Switches, Socket, Power distribution cabinet |
| ||
Washing/ shower room | It could include the toilet, washing basin and shower
| ||
Nails, expansion bolts, glue and so on |
| ||
Technical parameters | Live load capacity of roofing | 0.5kn/m2 |
|
Second floor load capacity | 150kg/m2 |
| |
Bearing load | 30kg/m2 |
|
1. Professional design and engineering team: Full solution for site camp design. We could make the design for whole camp as per your requirement.
2. Procurement and Manufacture for all material for prefabricated building. We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO standard, to make sure the fabrication works with high technology.
3. Site management & Installation supervision, We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
Brief introduction:
Established in 1995, LIDA Group -Weifang Henglida Steel Structure is one of the biggest manufacturer of prefabricated building in China, We have been awarded ISO9001-2000,CE and SGS certficates.Our daily capacity can reach 5000sqm and this is how we manage it.
750 employees, including 50 engineers and 200 workers in charge of supervising overseas projects.
73000sqm meters of factory space.
3 production lines for our prefabricated house series.
3 production lines for our container house series.
2 production lines for our steel structure warehouse/workshop series
1 production line for our light steel Villa series ovrseas branch office in Saudi Arabia, Qatar.
Production line:
Certificates: