perforated steel plank steel catwalk anti-skid steel scaffolding plank
USD $1 - $10 /Piece
Min.Order:500 Pieces
Tianjin Huilai International Trade Co., Ltd.
ring lock scaffolding bs1139 hot dip galvanized steel pipes types of scaffolding system
ringlock andamios multidireccionales second hand scaffolding for sale q345b standard
used scaffolding for sale in uae rosette ringlock electric scaffolding
building construction scaffold ringlock iskele ringlock scaffolding system
ringlock standard vertical kwikstage system scaffolding accessories folder ladder scaffold
perforated steel plank steel catwalk anti-skid steel scaffolding plank
Applications of scaffolding planks in construction: | ||||
1.Scaffolding plank is the main parts of scaffolding system which is | ||||
convenient for workers to walk on high building. | ||||
2.Stamping holes are on the scaffolding plank to resist skidding for workers. | ||||
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and moist | ||||
environment. | ||||
4. Various size of scaffolding plank could be customed. | ||||
Advantage of scaffolding planks used for construction: | ||||
1.durable & stable | ||||
2.good bearing capacity | ||||
3.low cost, high quality | ||||
4.Excellent security function | ||||
5.easy to assemble & dismantle | ||||
6.long durability, the working life can up to 5-8 years | ||||
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |
Specifications | ||||
Name | Scaffolding steel plank for construction | |||
Place of Origin | Tianjin, China (Mainland) | |||
Size | (more customized size available) | |||
Length (mm) | 1000 | 1500 | 2000 | (3000;4000) |
Width (mm) | 210 | 240 | 250 | (300;420;480;500) |
Height(mm) | 38 | 45 | 50 | |
Thickness(mm) | 1 | 1.1 | 1.2 | (1.5;1.8;2.0) |
Shape(Rib) | A.General Rib | B.V Stiffener | ||
Material | Q195-Q235 | |||
Good Market | Singapore ,Malyasia ,Middle East and Southeast Asia and all over the world | |||
Cerification | ISO9001:2008,SGS etc. | |||
Surface Finishing | pre-galvanized (Zinc Coated :60g/ square meter) | |||
Technique | automatic productive assembly line | |||
MOQ(Minimum Order Quantity) | 500 pcs | |||
Payment | L/C at sight ;T/T 30% deposit. | |||
Package | packed in bulk or in bundle. shipped by container or as client's request | |||
Production Capacity | 100000 pcs / month |
packed in bulk or in bundle. shipped by container or as client's request!!!
Tianjin Tianyingtai Steel Group is one of largest manufacturers of pipes. Founded in 2001 and headquartered in Jinghai county, Tianjin, producing and supplying various steel pipes (round/square/rectangular/oval /precision) and other related steel products of both black and galvanized.
TYT has invested a total of eight High Frequency welded lines in 55,000 square meter factory, with branch Tianjin Huilai International Trade Co Ltd & its metalwork established in Sep.2014, TYT starts to design & manufacture & supply Steel Props, Tripod, Euro Form, Frame System, Kwikstage-UK, Cuplock Scaffoldings, Ringlock, Scaffoldings, Jack Base, Steel Plank, Fittings.
Trade Show
Our QC
Our Team
A: Are you factory?
Q: We are , all photos above were taken from our site.
A: Do u have other relative production?
Q: We have steel props / ringlock / jack base / frame system/galvanized steel pipe.