2015 New Condition three phase dynamo generator made in china
USD $3,000 - $250,000 /Set
Min.Order:1 Set
Shandong Shuiwang Environmental Protection Equipment Co., Ltd.
1. Low oil consumption
2. Low noise level and exhaust level
3. Convenient to operate
4. High reliability, easy maintenance
5. The service covering the world
6. Made-in-China large generator
1) ISO9001
2) Our two engineers will be sent to instruct the installation and test, also be responsible for training.
Technical specification: | |||||
Genset Model | Genset Power(KW) | Diesel Engine | Electric Generator | ||
Prime Power / Standby Power | Manufacturer | Model | Power(KW) | Manufacturer | |
FD20GF | 20/22 | Huafeng | 495D10 | 26.5 | Chongqi |
Wuxixingnuo | |||||
Furi | |||||
Dongkang | 4B3.9-G1 | 27 | Chongqi | ||
Wuxixingnuo | |||||
Furi | |||||
4B3.9-G2 | 27 | Chongqi | |||
Wuxixingnuo | |||||
Furi | |||||
FD180GF | 180 | Shangchai | G128ZLD | 187 | Yingge |
Deke | |||||
Wuxixingnuo | |||||
Furi | |||||
FD420GF | 420 | Zongkang | KTAA19-G5 | 470 | Yingge |
Deke | |||||
Wuxixingnuo | |||||
Furi | |||||
FD450GF | 450 | Shangchai | 12V135BZLD1 | 505 | Yingge |
Deke | |||||
Wuxixingnuo | |||||
Furi | |||||
FD460GF | 460/520 | Zongkang | KTAA19-G6 | 520 | Yingge |
Deke | |||||
Wuxixingnuo | |||||
Furi | |||||
FD1500GF | 1500 | Jichai | H12V190ZLD | 1740 | Yingge |
Deke | |||||
Wuxixingnuo | |||||
FD2000GF | 2000 | Jichai | H16V190ZL | 2400 | Yingge |
Deke |
Photos of Dismountable Easy Operation 2015 New Condition three phase dynamo generator made in china
ONE EXAMPLE OF 2015 New Condition three phase dynamo generator made in china
PLC SYSTEM OF 2015 New Condition three phase dynamo generator made in china
STANDARD PRODUCTION WORKSHOP OF 2015 New Condition three phase dynamo generator made in china
TEST SECTION of 100kw 200kw Wind Cooled/Water Cooled DG SET with 1 year free spare parts
READY FOR SHIPMENT of 100kw 200kw Wind Cooled/Water Cooled DG SET with 1 year free spare parts
1.Payment:30% T/T in advance, 30% T/T for production,40% T/T before shipment
2.Delivery Time: Within 30 days after receiving your advanced payment.
1. Shuiwang Field Service.
Shuiwang field service engineer can assist on-site with reassembly and commissioning.
Engineer training and techinical assistance can also be done locally.
2.Spare Parts Services
With our years of experience we have established strong buying power and an extensive supplier network.By expanding our network of global service hubs,we are able to shorten our response times.Our service goes beyond fast part delivery.
3.Good Quality
To minimise lifecycle costs and to improve an equipment's performance,it's crucial to have the right spare parts.
4.Design Service
Clients can take the design-only option and have the system built by others.
1.Gold mining plant
2.Generator set
3.Amphibious excavator(Swamp buggy)
4.Sand pump
5.Wheel loader
6.Dredger