Gold Dredger/Cutter Suction Dredger/2017new
USD $40,000 - $200,000 /Set
Min.Order:1 Set
Shandong Shuiwang Environmental Protection Equipment Co., Ltd.
Principal Dimensions and Characteristics(CUSTOMIZED) | ||
Hull Length: | 13.00 m | 43 feet |
Hull Width: | 5.00 m | 16 feet |
Hull Depth: | 1.42 m | 5 feet |
Main Pontoon: | 11.00 x 3.0 x 2.20 m | 36 x 10 x 7 feet |
Side Pontoon: | 13.00 x 1.00 x 1.5 m | 43 x 3 x 5 feet |
Dredging Depth (max.): | 15 | 49 feet |
Total Weight: | 55 tonnes | |
Diesel Fuel Capacity: | 10,000 liters | 2,642 gallons |
Main Engine | ||
Make/Model: | Cat / D379 B | |
Power @ 1,200 RPM | 427 kW | 573 hp |
Auxiliary Engine | ||
Make/Model: | Cat / 333C | |
Power: | 12 kW | 150 hp |
Dredging Pump | ||
Make/Model: | Shijiazhuang | |
Suction Diameter: | 350 mm | 14 inches |
Discharge Diameter: | 300 mm | 12 inches |
Nominal Pump Capacity Range (up to): | 1,500 cubic meters/hr | 1,962 cubic yards/hr |
Cutter | ||
Make/Model: | Hydraulic Harderwijk | |
Power: | 75 kW | 100 hp |
Parts
40KN WINCH
CUTTER
Assembling
Testing
Shipment
Working
Customer visting
2)Simple, rapid assembly and dismantling.
3)Reliable hydraulic system.
4) Ready for operation on arrival at site.
5)Eifficient fuel consumption.
6)One-man operation.
7)Wide range of optional equipment avaiable.
1) ZC class standard of PRC
2) Our two engineers will be sent to instruct the installation and test, also be responsible for training.
1) Construction Dredging
2)Environmental Dredging
3)Mining Dredging
4)Navigational Dredging
5)Restoration Dredging
6)Specialty Dredging
1.Payment:30% T/T in advance, 30% T/T for production,40% T/T before shipment
2.Delivery Time: Within 90 days after receiving your advanced payment.
1. Shuiwang Field Service.
Shuiwang field service engineer can assist on-site with reassembly and commissioning.
Engineer training and techinical assistance can also be done locally.
2.Spare Parts Services
With our years of experience we have established strong buying power and an extensive supplier network.By expanding our network of global service hubs,we are able to shorten our response times.Our service goes beyond fast part delivery.
3.Good Quality
To minimise lifecycle costs and to improve an equipment's performance,it's crucial to have the right spare parts.
4.Design Service
Clients can take the design-only option and have the system built by others.
1.Gold mining plant
2.Generator set
3.Amphibious excavator(Swamp buggy)
4.Sand pump
5.Wheel loader