sawdust charcoal powder briquetting machine
USD $2,000 - $50,000 /Set
Min.Order:1 Set
Henan Meshen Machine Manufacturing & Trading Co., Ltd.
sawdust charcoal powder briquetting machine
1 General Description of sawdust charcoal briquetting machine
Our coal briquettes extruder use the application of the principle of the spiral extrusion , which make it become a certain intensity round or hexagon, triangle, ect charcoal/coal rods by working for the powered coal/charcoal mixed with binder.It is widely used in chemical industry ,metallurgy and ceramic industry , which is the ideal equipments of enterprise specialized in efficient production and reducing consumption.
2 Working principle of sawdust charcoal briquetting machine
3 Outstanding Features of sawdust charcoal briquetting machine
1.big incoming lathe screw constant and faster material processing rate and energy saving !
2.Rigid connection is used between the shaft block and cylinder. The machine Φhave a stable working performance better than ever.
3.Hydraulic coupler drive is used . So the machine is smooth in operation and have small noise, Also have the function of overload protection.
4.Custom-made services are provided.
5 Detailed parameters of sawdust charcoal briquetting machine
Model | MBJ140 | MBJ180 | MBJ300 | MBJ400 |
Capacity | 1-2T/H for coal; 0.5-1T/H for charcoal | 2-3T/H for coal; 1-1.5T/H for charcoal | 3-5T/H for coal; 1.5-2.5T/H for charcoal | 6-10T/H for coal; 3.0-5.0T/H for charcoal |
Diameter of mould | 20-40mm | 20-60mm | 20-80mm | 20-80mm |
Main shaft speed | 46-60r/min | 39-60r/min | 35-60r/min | 35-60r/min |
Number of Spiral Blades
| 4 | 4 | 4 | 4 |
Motor | Y160m-4 11KW Y160L-4 15KW | Y180m-4 18.5KW Y180L-4 22KW | Y225s-4 37KW Y225m-4 45KW | Y315m-4 160KW |
Reducer | ZQ350 | ZQ400 | ZQ650-750 | ZQ850 |
Bearing | 7511,211,210,1305 | 7614,314,313,1206 | 32320,320,319,1207 | 32322,322,321 |
Note | Spindle speed is the lowest speed, according to the current size and load weight, increase the level of appropriate yield
|
6 Payment,Packing and Delivery
l Payment :30% TT in advance, 70%6TT balance pay off before delivery.
l Packing: The machine and wear parts will protected by plywooden box or as customers’ will.
l Delivery time: For one set, the delivery time is 7-10 days, for 1-5 sets 20-25 days, above 5 sets usually negotiate.