Small Plastic Pyrolysis Machine/Plastic Film Pyrolysis Machine
USD $30,000 - $50,000 /Set
Min.Order:1 Set
Shangqiu Dayi Electromechanincal Technology Co., Ltd.
Major parts
Reactor | 1. Made of Q245R boiler steel. Also can choose Q345R 2. Auto-welding both inside and outside 3. With rock wool and first grade alumilum insulation board |
Auto-feeder | 1. 60 ton hydraulic pressure 2. Can feed all types of materials 3. Save labor and time
|
Catalyst chamber | 1. improve oil yield and oil quality 2. Reduce the speed of oil gas so that it can be better cooled |
Oil-water separator | 1. Separate oil and water 2. Collect heavy oil 3. Water sealing design keep safety |
Condenser | 1. Include condenser pipe, horizontal condenser and waste gas condenser 2. The oil gas is cooled separately by small pipes inside condenser 3. Light oil is collected here |
Vacuum device | 1.Keep machine running under normal pressure 2.Have founction of keeping safe |
Anti-back fire device | 1. Recycle residual gas to furnace as fuel 2. Water sealing design prevent tempering |
Dust removal device | Dispose of flue gas caused by using coal, wood, oil or natural gas. |
Work flow:
Oil rate of waste plastic and tyre pyrolysis | ||
PE | 50%-75% | |
PP | 50%-75% | |
PS | 50%-75% | |
ABS | 40% | |
Leftovers of paper | Wet 15-20%, dry 60% | |
House garbage | 35-50% | |
Plastic cable | 80% | |
Plastic bag | 50% | |
Submarine cable | 75% | |
Rubber cable | 35% | |
Sole | 30% | |
Big tires | 45-50% | |
Small tires | 35-40% | |
PVC | Not suitable | |
PET | Not suitable | |
Big tyre | 40-45% | |
Small tyre | 30-35% |
Feature of our plants:
1.Environmental protection equipment: The complete set of unit produces
no smoke and no smell
2. High efficiency and good performance: the output capacity of pure raw
is more than 80% . net oil yield over more than 40%
3. The design of unit is reasonable and advanced :
Payment term and delivery:
30% TT deposit, balance paid by Sight LC/ 100% Sight L/C
Delivery with 25 days after getting advance payment or Sight L/C
After-sale service:
1. Delivery time-- It will be within 15 working days after we receive the deposit.
2. Warranty- The warranty period is 2 Years, engineers available to service at any time.
3. Installation and Training-- Our Company will dispatch one technician for installation and training, ensuring the operation safety. The installation period
shall be one month; otherwise, you have to pay extra salary for the technician with the price of USD 60.00 per day.
4. Regular phone visiting to check out if there is anything we can do for you, maintenance guiding, easily worn-out parts and catalyst offering, on-site maintenance.