Truck Engine TD123 TD122 TD103 Outer Air Filter 1080918 10809184 1080918-4
USD $1.9 - $15 /Piece
Min.Order:50 Pieces
Guangzhou Coral Machinery Co., Ltd.
Truck excavator loader engine Coolant Filter 1661964-5 1699830-7 20532237 1699830
Dump truck excavator loader Engine Air Filter 11033999-1 12978857 11033999
Truck Engine D39C TD40 Air Filter AF1989 AF4895 1586882-1 1082111
Truck Engine TD70F TD70FS TD70G Air Filter 8237018 8152010-8 8152010 8152010-1
1.Photos of Air Filter 1080918-4
2.Details of Air Filter 1080918-4
Item | Dump truck Engine Air Filter 2243946 AZ26007 4785746 |
Part NO. | 1080918-4 |
Descriptions | Outer Air Element with 4 Bolt Holes |
Fits | Trucks |
Size | Standard |
Certification | ISO/TS 16949:2009 |
Service | OEM/ODM |
Business Type | Factory/Manufacturer |
Delivery time | 7-20 days after received your payment |
Samples | available |
Stock | Yes |
Service provide:
OEM ODM & OBM service; Coralfly packaging or according to customer's need packaging
Quality Guarantee:
If there have any quality problems with CORALFLY products, we are willing to be replaced free.
After-sales service:
There is any problem caused by using CORALFLY products:
1). Keep the defective products and contact with Coral Machinery or Coral Machinery distributor
of your religion timely.
2). Do not cut or change any suspected problem products, if necessary, Send the suspected filter
and the attached oil and the coolant sample together to Coral Machinery or Coral Machinery
distributor of your religion timely.
3). Attached with repair document, parts list, labor costs and any other materials which can support
a claim for compensation.
1. What’s Minimum Order Quantity?
A: Each item and/or color has a minimum order quantity, which would be stated in our quote sheet.
Assorted items would be negotiable upon request.
2. What’s kind of your packaging?
Coralfly packaging or customer’s requirements.
3. Could I get some samples? How could i pay the sample payment?
A: We are honored to offer you samples. We accept the sample payment
via Western Union or Bank of China.
4. How long is your Delivery Lead Time ?
A: If there is stock, the lead time is about one week after we get the payment,
if need to be produced, 7-20 days after we get the prepay.
5. Could you Calculate the shipping cost for me?
A: Yes, we are honored to do that for you! Before the freight ,
please well let us know which seaport or airport near your place.
Interested ? Inquiry Now!
Let's talk the details online or by Email
You Will Get Best Offer Within 24 Hours