Engine TAD1030GE TAD1031GE TAD1032GE Coolant Filter 9N3368 366822
USD $1 - $9 /Piece
Min.Order:50 Pieces
Guangzhou Coral Machinery Co., Ltd.
QAS 150 Generator Engine TAD720GE Excavator Oil Filter 1173430 3831236
BL71 Loader Engine D4D CBE1 Fuel Water Separator 11110474 11110668
Generator Engine TWD710G TAD740GE Oil Filter 485GB3191 4666343 466634
Truck bus Engine Fuel Water Separator Filter FS19735 20998367 20514654
Generator Engine D100B Loader Engine D100 Air Filter 8152010 823701 8237018
1.Photos of Coolant Filter 366822
2.Details of 20532237
Item | Engine TAD1030GE TAD1031GE TAD1032GE Coolant Filter 9N3368 366822 |
Part NO. | 366822 |
Descriptions | Coolant Spin-on with BTE Formula |
Size | Standard |
Certification | ISO/TS 16949:2009 |
Service | OEM/ODM |
Business Type | Factory/Manufacturer |
Delivery time | 7-20 days after received your payment |
Samples | available |
Stock | Yes |
Service provide:
OEM ODM & OBM service; Coralfly packaging or according to customer's need packaging
Quality Guarantee:
If there have any quality problems with CORALFLY products, we are willing to be replaced free.
After-sales service:
There is any problem caused by using CORALFLY products:
1). Keep the defective products and contact with Coral Machinery or Coral Machinery distributor
of your religion timely.
2). Do not cut or change any suspected problem products, if necessary, Send the suspected filter
and the attached oil and the coolant sample together to Coral Machinery or Coral Machinery
distributor of your religion timely.
3). Attached with repair document, parts list, labor costs and any other materials which can support
a claim for compensation.
1. What’s Minimum Order Quantity?
A: Each item and/or color has a minimum order quantity, which would be stated in our quote sheet.
Assorted items would be negotiable upon request.
2. What’s kind of your packaging?
Coralfly packaging or customer’s requirements.
3. Could I get some samples? How could i pay the sample payment?
A: We are honored to offer you samples. We accept the sample payment
via Western Union or Bank of China.
4. How long is your Delivery Lead Time ?
A: If there is stock, the lead time is about one week after we get the payment,
if need to be produced, 7-20 days after we get the prepay.
5. Could you Calculate the shipping cost for me?
A: Yes, we are honored to do that for you! Before the freight ,
please well let us know which seaport or airport near your place.
Interested ? Inquiry Now!
Let's talk the details online or by Email
You Will Get Best Offer Within 24 Hours