20-100Ton latest technics crude canola oil refining line
USD $39,000 - $689,001 /Set
Min.Order:1 Set
Zhengzhou Maosheng Grain And Oil Machinery Co., Ltd.
1. 10-800T/H oil material first cleaning, drying and storage section turn-key project.
2. 50-3000 T/D oil pretreatment, shelling and pre-press workshop turnkey project (soybean hot peeling, bean skin crushing; the soybean extrusion, high oil contained pre-press cake extrusion, and high oil contained embryos puffed; of direct puffed). Rice bran production line turn-key project.
3. 30-3000T/D Leaching workshop turnkey project (Towline extractor, Rotocel extractor, loop type extractor, DTDC separated machine, the full negative pressure evaporation, paraffin wax recovery, leaching workshop degum, phospholipid concentrate).
4. 30-3000T/D oil continuous grade two or one physical (chemical) refining production line.
5. 5-800T/D sunflower oil, rice bran oil, corn germ oil dewaxing turn-key project
6. 10-200T/D Fatty acid esterification production cooking oil production line.
Raw Material For crude canola oil refining line
Crude soybean oil, crude peanut oil ,crude rapeseed oil,crude cottonseed oil,crude sunflower seeds oil,crude palm oil,crude linseed oil,crude tea seed oil,crude corn germ oil, crude rice bran oil etc.
Crude canola oil refining line Flow Chart
crude oil → degumming&dephosphorization → deacidification → drying → decolorization → deodorization → defatting → dewaxing → finished oil.
Crude Canola Oil Refining Method
1. Chemical refining
2. Physical refining
3. Chemical and physical refining
Units devices of Rice Bran Oil Refinery Machine
(1).Refining pot: used to P-acid de-gumming, alkali refining de-acid and water rinsing.
(2).De-color pot: used to remove off pigments, bleaching oils and grease dehydrate.
(3).Deodor pot: used to remove off oils odor, foreign smells (stainless madeHeattransfer oil stove: supply each device production needing heat energy, temperature reach above 280C.
(4).Steam generator: produce the needing steam for de-odoring and distillation.
(5).Vacuum pump: supply needing vacuum for dehydrate, de-color, de-odor
(6).Press filter: filter clay, filter out clear oil.
(7).Air compressor: blow dry bleached clay, blow empty the leftover oil in the press filter.
Final oil quality
1 Grade one for salad oil
2 Grade two for high quality cooking oil
3 Grade three and four for cooking oil
The Buyer will transfers the payment for the Equipment and Technical Service into the Seller’s account as follows:
* The sum equal to 30% of the total amount of the Contract must be transferred by the buyer to the Seller’s account directly within Five (5) bank working days from the date when the Contract has been both signed as down payment.
* The sum equal to 70% of the total amount of the Contract will be transferred by the buyer to the Seller’s account directly after checking and accepting the finished equipment in the seller's factory at five(5) bank working days, we can also accept the rest 70% payment by L/C at sight .
Pre-sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
1. The equipment guarantee period is one year, During guarantee period ,The seller will provide maintenance free service.(Except the breakdown and destroy caused by person and force majeure)
2. After receiving the informing of repairing ,The technical person of sell party will solve by phone and email ,if it is need and the seller will send technical person to solve the problem on the spot.
3. During the quality guarantee period ,if it is the quality issues (except easily damaged parts),The cost for maintenance and replace will be borne by sellers.
4. During guarantee period, The seller will provide service of with compensation as follows:
(4.1)The damage caused by person and force majeure;
(4.2)The damage caused by improper operating;
(4.3)The damage caused by reforming, decomposing assembling.
5. Paid service will be provided for the long term after guarantee period ;
6. Free service will be provided for the long term after guarantee period.