Hot sale corn oil machine
USD $4,000 - $451,000 /Set
Min.Order:1 Set
Zhengzhou Maosheng Grain And Oil Machinery Co., Ltd.
1.We undertake pre-treatment, pressing, extraction, oil refining and the auxiliary projects, the services include civil negineering, process design, auto-control, layout plan and the cereals and oils further processing, ybean phospholipids, proteins, rare and high-value oils. In addition, we undertake process design and construction of feed mill, wheat flour plants.
2. 10-500T/H oil material first cleaning,drying and storage section turn-key project.
3.100-3000 T/D oil pretreatment, shelling and pre-press workshop turnkey project (soybean hot peeling, bean skin crushing; the soybean extrusion, high oil contained pre-press cake extrusion, and high oil contained embryos puffed; of direct puffed).
4.100-3000T/D leaching workshop turnkey project (Towline extractor, Rotocel extractor, loop type extractor, DTDC separated machine, the full negative pressure evaporation, paraffin wax recovery, leaching workshop degum, phospholipid concentrate).
5.30-1000T/D oil continuous grade two or one physical (chemical) refining production line.
6.20-600T/D Crude palm oil, rice bran oil, corn germ oil dewaxing turn-key project
7.10-200T/D Fatty acid esterification production cooking oil production line.
1.Pretreatment process
Oil seeds→cleaning→stones removal→magnetic selection→cracking→softening→flaking→cooking→to oil press/extraction workshop.
2.Extraction process
Oil cake→extraction with solvent→mixed oil→evaporation→evaporation→steam-stripping→crude oil
3.Refining process
Crude oil→degumming, washing, drying →decolorization →deacidification →deodorization →refined oil
4. Specificaitons
(1).Cleaning:Remove the raw material peanut in various impurities, such as: iron, stones, clump, such as the plant leaf, clean up after the raw material peanut impurity content should not exceed 0.2%.
"No best, Only better"
We will be commitment to provide high quality products with perfect site services and after-sales service. Now the specific commitments are as follows:
1. Ensure to timely provide complete sets of equipment and accessories.
2. Ensure that one-time installation debugging acceptance.
3. To provide high quality material with preferential price.
4. Priority to provide customer our new craftworks and products.
5. Free training technological operator to ensure the trained staff can operation independently.
6. In the installation process,we will appoint a installation supervision staff on the spot.
7. we will offer an experienced project manager, organize a good installation team for the work of field installation debugging.
8. After the equipment field assembly and installation, we will be also responsible for the single equipment debugging, online debugging and Feeding trial operation, to ensure that equipments can normal operate in full load conditions.
We will provide all kinds of information and records according to the requirements of the bid.
The qualified completion files will be provided to customers according to their requirements within one month after acceptance.
9. In the warranty period, all because of the quality of products has caused the damage or failure of equipment, suppliers will take the responsibility for the free repair and replacing spare part.
10. Due to the damage caused by the customer,we only charge material costs for repair and replacement.
11. After the receipt of customers notice,we will suggests the method to solve problem within six hours,or send specialist to the site to solve the problem within twenty four hours.