Double effect falling film milk evaporator
USD $5,000 - $50,000 /Unit
Min.Order:1 Unit
Jiangsu Jufeng Machinery Co., Ltd.
Double effect falling film milk evaporator
Recommend:
Two effect evaporator :this equipment adopts two effect dowm failing film to evaporator the water in the milk and fruit juice;Construction:evaporator,separator,condenser;
Usage:popularly used for concentrating and dehydration in food,biology engineering,pharmacy and chemistry etc.
Automatic control:manual operated and full auto control.
Characteristics:
1,Adopts twin effect type,high use factor of steam,low energy consumption;
2,Full closed process, fast and low temperature evaporation; so the nature color flavor and smell is well remained.
3,Heating fast with high: effciency and hard to produce the deposit on the machine's inside wall;
4,Large scale of the concentrate ratios theproducts between the different effects can recycle separately, so the concentrate ratio can be regulated in large scale.
Technical parameters:
Model | Evaporation capacity of water | External dimension LXWH(mm) | Steam consumption | suggested power(kw) |
JFS-2-0.8 | ≤ 0.8(T/h) | 4500X2500X7000 | ≤ 0.45(T/h) | 20 |
JFS-2-1 | ≤ 1(T/h) | 4500X2500X7200 | ≤ 0.55(T/h) | 22 |
JFS-2-1.5 | ≤ 1.5(T/h) | 4800X3000X7600 | ≤ 0.8(T/h) | 30 |
JFS-2-2 | ≤ 2(T/h) | 4800X3000X7800 | ≤ 1.1(T/h) | 30 |
JFS-2-3 | ≤ 3(T/h) | 4800X3200X8000 | ≤ 1.65(T/h) | 35 |
Jufeng enterprise is a professional diversfied machinery manufacturer integrating design, development,manufacturing,engineering installation,after-sales service,etc. The company took the lead among the industry in obtaining the National D-class "special equipment manufacturing license" and ISO9001:2000 international quality system certification.
Jufeng enterprise is a professional diversfied machinery manufacturer integrating design, development,manufacturing,engineering installation,after-sales service,etc. The company took the lead among the industry in obtaining the National D-class "special equipment manufacturing license" and ISO9001:2000 international quality system certification.
bout Delivery time
Q-----What’s the delivery term for making business with us?
A----- FOB, CFR & CIF optional; It’s mainly depend on client’s requirement;
About Lead Time
Q------What’s the lead time after placing order?
A------Usually it takes about 25~30 days after we received your deposit.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
About Payment Term
Q------What’s the Payment Term?
A------ By T/T in Advance, or Irrevocable L/C at Sight.
Our equipments can be customized, leave an inquiry to know more details about price, packing, shipping and price.
Send your message to following supplier :
We are looking forwarding to cooperating with your in near future. any enquiry please let us know.