Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

USD $20,000 - $60,000 /Set

Min.Order:1 Set

Supply Ability:
50 Set / Sets per Month
Port:
Tianjin Shanghai Qingdao etc
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Condition:
New
Type:
Other, Core Drilling Rig, core drilling rig for exploration
Power Type:
Other, Hydraulic
Place of Origin:
Henan, China
Brand Name:
GEC
Model Number:
GL-3000

Zhengzhou Gaode Equipment Co., Ltd.

Business Type: Manufacturer,Trading Company
Zhengzhou Henan China
Main Products: peristaltic pump ,grout pump ,shotcrete machine ,plaster machine ,foam concrte machine

Product Details

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

 
Product Description

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

 

The  Full Hydraulic Crawler tunnel construction core drilling rig for exploration  , model type GL-3000, is mainly applied for core drilling of geological exploration in tunnel (gallery). It can also be used for exploration and reinforcement constructions (including core drilling and standard penetration) of foundation works, such as road, railway, bridge, dam foundation and industrial & civil projects, etc. The characteristics of this machine is obvious: advanced direct-acting hydraulic system of load feedback tuning variables, with vertical rigs, power head rotation and speedup display, wide range of speed and suitable for various drilling methods such as carbide bit drilling and diamond bit suitable for anchor construction. For difficult geological situation, drilling with casing can be fulfilled with down hole hammer and casing drilling tool. The rig is functionally complete, easy to operate and powerful in solving accidents.

 

Features 

 

Technical Data

Drilling depth

500m

Rod dia 

50mm, 73mm, 89mm 

Top-drive head speed

0-500r/min

Max Torque of top-drive head

2900N.m

Stroke of top-drive head

1800mm

Rated thrust force of top-drive head

48kN

Rated Pull force of top-drive head

94kN

Column cylinder extension

1000mm

Drilling angle range

0~90ºor ±3º

Hydraulic system rated pressure

25MPa

Moving speed

1.5km/h

Climbing capacity

20º

Power unit

45kw

Dimension(L*W*H)

3390x1600x3150(working);3110x1600x1800(transporting)(mm)

Weight

3600kg

 

Drilling equipment of various kinds:

faucet, alloy drilling core, pipe fittings, hopper, funnel, casings,  filling catheter, hammerhead, core drill pipe, joint locks,

the Soil, Single, double , three high pressure jet grouting rods, etc.

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

 

Application

 

Full Hydraulic Crawler Multifunctional Use Widely Engineering Tunnel Core Drilling Rig  can be used in the following projects: tunnel pipe-shed, deep excavation anchoring projects, road and dam consolidation projects, holes for ground-source heat pump, hydrological and well drilling, foundation piles and geological disasters control projects, etc.

 

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

  • construction project

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration 

Packaging & Shipping

 

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

 

Packaging Detail: Standard export packaging; or as your requirements

 

Shipping Detail: in stock; out of stock(20 working days); customized(30 working days)

 
FAQ

Full Hydraulic Crawler tunnel construction core drilling rig for exploration  is used in the following projects: tunnel pipe-shed,deep excavation anchoring projects, road and dam consolidation projects, holes for ground-source heat pump, hydrological and well drilling, foundation piles and geological disasters control projects, etc.

 

1: How long does it take to drill 50m hard rock layer?

That all depends. It is decided by the hardness of rock and your operating experience. As for the efficiency, it may need more

time to drill 50m rock layer compared with those big drilling machines with air compressor. 

 

2: Can it be used for railway, street, bridge, dam foundation or building drilling?

Of course, GL-3000 is specially designed for railway, street, bridge, dam foundation and building  drilling and engineering drilling.

if you buy it for that, it will be your best choice. It can be

used for mine exploration, too.

 

3: Could you train our workers?

GL-3000 is easy to be operated. After you buy our product, detailed operation instructions with video will be offered.

Wewill be responsible all the time. Also we can talk about sending engineers to help you. 

 

More details, please feel free to contact us! Thanks.  

 
Our Services

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

 

We provide high quality drilling rigs, and overseas after sale services.

 

Trade assurance advantages:
1. Quickly lock trusted seller, saving time and energy;
2. Reduce the risk of online purchasing;
3. If there is a trade disputes, you can complain to Alibaba and get benefits compensation.

We are a member of trade assurance on Alibaba, and our trade assurance amount is USD78000.00 Through trade assurance you can 100% payment refund up to trade assurance amount for orders not meeting agreed Delivery or Quality terms.

 

Company Information

We manufacture various kinds of drilling rigs, mud mixer, injectting pump machines as follows:

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

Full Hydraulic Crawler tunnel construction core drilling rig for exploration

 

If you have any question please feel free to contact me.                        

Gaode Equipment Co.,Ltd.

Tel:+86-371-55951210 Fax:+86-371-63526676

Skype: lena.liu8

Whatsapp&viber: 86-15903613994

Thank you for your time and Welcome to Visit our factory!

Contact Supplier

Ms. Jessica Liu Sales Manager Chat Now
Telephone
86-371-55951210
Mobile
15903613994
Fax
86-371-63526676
Address
No.9, Building 14, Yard No.4, Fengqing Road, Jinshui District, Zhengzhou, Henan China Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mine Drilling Rig
Categories
Hi~