Widely Used Bucket Chain Gold Mining Dredge
USD $20,000 - $300,000 /Set
Min.Order:1 Set
Qingzhou Hengchuan Ore Machinery Co., Ltd.
Widely Used Bucket Chain Gold Mining Dredge
1. Composition of Widely Used Bucket Chain Gold Mining Dredge
1). Hull: It is made of two or three pontoons,which used for installing various equipment,
including operating cabin, pump cabin, etc.
2). Mining system: It is made of the dredging bucket, chain, underwater big arm, upper
and lower quadrangle wheel, active power, main reducer, main frame and other components.
It is mainly used in surface mining operation and ore mining.
3). Mine Selecting Equipment: It is made up of sand trommel screen, gold washing machine,
pump, gold selecting chute or centrifugal concentration machine, etc.
4). The Waste Tailings System: It is made of conveyor belt, chute, motor, reducer, and it is used
for discharging waste gravel and tailings.
5). The Lifting System: it is made of gantry, arm lifting winch, anchor winch, sliding winch, etc.. It is
used for lifting and falling underwater arm, mooring dredger ,etc.
6). Power System: diesel engine, electronic generator sets, distribution box. It is used for providing
lighting and working electricity and so on for the entire dredger.
2. Parameters of Widely Used Bucket Chain Gold Mining Dredge
3. Pictures of Widely Used Bucket Chain Gold Mining Dredge
Fast contact ways: