Jinan Eagle Kurkure manufacturing extruder machines
USD $5,000 - $35,000 /Set
Min.Order:1 Set
Jinan Eagle Food Machinery Co., Ltd.
Specifications
1.High yield and low consumption
2. nik nak , kurkure , cheetos processing line
3. automatic and easy operation
4.CE , ISO
Product introduction :
Kurkure/nik nak / corn curls is one new style extruded snacks, very crunchy and great in taste. Kurkure are made by extrusion process.
The Kurkure corn meal is moisturized in the flour mixer with water and fed to the Rotary die Extruder. In the extruder, due to excess heat and pressure from the screws the meal gets heated and the moisture content gets reduced. The meal passes through the die and gets cut by the cutting knifes into required lengths.
The Kurkure are fried in cooking oil and then cooled before flavoring. Or directly Seasoning , is sprayed on the Kurkure surface to improve their taste.
The whole flow craft in making Kurkure:
a): Flour Mixer
To mix corn meal with water to prepare the flour for Kurkure
b): Rotary Die Extruder DP76 extruder
To cook the corn meal and extrude the Kurkure from the die. The Rotary Die twists and curls the meal before extruding giving a uniform texture
c): Automatic Frying Machine
To fry the Kurkure in hot cooking oil. The uniform frying introduces the crunchy taste to the Kurkure
d) : Cooling Conveyor
To cool the fried Kurkure and reduce the temperature before packing
e): Automatic Seasoning System
To add required seasoning to the fried and cooled Kurkure to give the different flavors to them
f) : Automatic Packaging Machine
To pack the Kurkure into attractive printed pouches with gas flushing
Output
100-150kg/h , 200-250kg/h and 400-550kg/h for choose from .
Q1: If we buy machines, what is the after-sale service?
Jinan Eagle Food machinery manufacture will send the engineer to buyer’s factory. Offer the trainee program, start the related food production as customer request.
Q2: If machines wearable parts need to change, what should we do?
Jinan Eagle Food machinery manufacture will offer the wearable parts all the time.
And offer the on-line video instruction for the operation.
Q3: What is the payment terms if we want to buy the machines?
Usually it is 30% by T/T, pay the balance by T/T before delivery or L/C at sight.