TVP Histone Soya Protein production Machinery
USD $10,000 - $50,000 /Set
Min.Order:1 Set
Jinan Lerun Machinery & Equipment Co., Ltd.
Soya / Peanut Protein Food Machine
Description:
Soybean protein food processing line takes soybean and peanut as main raw materials. After milling, mixing, tempering, high-temperature, high-pressure, high-cutting, then the spherical protein molecules change into chains and becomes layer fiber structure. It is similar with the muscle state of the animal and without the smell of beans.
Raw Material:soya, peanut, soybean
Capacity: SLR65-5 260KG/H SLR85-4 500KG/H
Consumption: SLR65-5 84.2kw SLR85-4 150.3kw
Machine Surface: Stainless Steel
Flow Chart:
Mixer-----Screw Feeding-----Conditioner-----Extruder-----Air Conveyor-----Oven
Technical Parameter:
Technical Parameter of 260kg/h of standard configuration SLG 65-5
Model
Parameter |
Mixer |
Screw feeding |
Conditioner |
Extruder |
Air conveyor |
Five-layer oven |
Model | BFJ-II | SLJ-I | DTZ-II | SLG65-V | FSJ-II | DKX-5-8 |
Installed capacity | 4 | 1.1 | 4 | 57.75 | 1.1 | 60(heating) |
consumption | 3 | 1.1 | 4 | 30 | 1.1 | 45(heating) |
Output | 300 | 300 | 300 | 260 | 300 | 280 |
Technical Parameter of 500kg/h of standard configuration SLG 85-4
Model Parameter |
Mixer |
Screw feeding |
Conditioner |
Extruder |
Air conveyor |
Seven-layer oven |
Model | BFJ-II | SLJ-I | DTZ-II | SLG85-IV | FSJ-III | DKX-7-8 |
Installed capacity | 4 | 1.1 | 4 | 150 | 2.2 | 90 (heating) |
consumption | 3 | 1.1 | 4 | 80 | 2.2 | 60 (heating) |
Output | 300 | 500 | 500 | 500 | 500 | 500 |
Our service:
1.Provide you with the professional advice on the market,equipments,raw materials and production line ect.
2.Assist you to choose the ideal equipment,design the flow and we can offer on-site service.
3.Make compensate plan to the changeover of the material according to your final product, even we can perform the process at site.
4.Specially design the machines,practice test and provide relevant training as you required
5.One year warranty and life-time maintenance, with favorable price on spare parts permanently.
6.Provide reasonable packing and transportation plan, send technician to install and debug the machines and train your workers.
Sample Photos: