Used plastic washing recycling line
USD $100,000 - $500,000 /Set
Min.Order:1 Set
Used plastic washing recycling line
1. Function of the Used plastic washing recycling line
Input capacity | 500kg/h | 1000 kg/h | 2000 kg/h |
Workshop(M*M*M) | 42 (L)×10(W)×6(H) | 55(L)×15(W)×6(H) | 70(L)×18(W)×6(H) |
Ancillary staff | 6Persons | 8 Persons | 12 Persons |
Installation power | 156KW | 307KW | 420KW |
Water Consumption: | 2Ton/h | 3.5Ton/h | 5 Ton/h |
Final product | Moisture: max 1% Bulk density: 0.3G/CM3 Particle size: 14-18mm Metal content: max.20ppm Floatable contamination: less than 200ppm Total impurity: 320ppm | Moisture: max 1% Bulk density: 0.3G/CM3 Particle size: 14-18mm Metal content: max. 20oom Floatable contamination: less than 200ppm Total impurity: 320ppm | Moisture: max 1% Bulk density: 0.3G/CM3 Particle size: 14-18mm Metal content: Max. 20ppm Floatable contamination: less than 200ppm Total impurity: 320ppm |
2. General information of Used plastic washing recycling line
Raw material | Post-consumer PET bottles |
Final product & Output capacity | PET bottle flakes / 2000kg/h |
Machine color | Standard color: Blue and Yellow |
Description of final product | 1. Moisture: Max.1-2% 2. Bulk density: 0.3G/CM3 3. Total impurity :320ppm a-Metal content:20ppm b-PE/PP content:200ppm 4. Particle size: 14-16mm If adopt optional items, it’s available to reach 50ppm for PVC and 100ppm for total impurity, the flakes quality will reach FDY and food grade. |
Flowsheet
3. Pictures of Used plastic washing recycling line
• We design, engineer and manufacture and customized the extrusion line.
• Choosing the right solution: In plastics manufacturing, process is everything. We carefully evaluate each project's requirements, weigh the options and recommend the best solution for the client.
• Training & Development: we offer extensive start-up assistance, comprehensive training. As well as Engineers for training and installation at our client’s factory
• Support: We support the client in all the stages of the project life cycle, as well as the constant spare parts supply in a time efficient manner.