truck water expansion tank factory supplier
USD $1,000 - $10,000 /Piece
Min.Order:1 Piece
Zhejiang Huangyan Toutuo Plastic & Hardware Factory
1.Professional in make all kinds blow moulding and injection plastic moulding.
2.Professional moulding designer.
3.High quality and competitive price.
4Strict quality control in all production process .
5.Professional in welding mould which is essential for expansion tanks
6.Rich experienced skilled workers.
7.On-time delivery
8.Continuance service and technical support.
1.Mould Design/sample
Product, mould, etc.
2.Discussion
Mould material,mould cavity number,mould price,mould runner, Injection mould payment,etc.
3.Order placed
According mould drawing or sample.
4.Design mould
We will send mould design to customer for confirmation
5.Mould tooling
We start to make mould after mould design confirmed
6.Mould processing
Send mould pictures to customer to let customer what we doing
7.Mould shot trial
Send mould shot trial samples to customer to confirm mould quality
8.Delivery
Ship mould after mould quality confirmed.
Or we will produce the products and export the products.
We are specialized in the mould and production for blow molding and injection molding for more than 30 years. It makes us confident to cooperate with the customers to develop difficult products from design to production. The mould can be developed with the drawing or samples in short time. We wined good reputation with good quality and reasonable price.
The daily necessary products are including foldable water carrier, watering pot, plastic barriers,seaplane raft,oil pack, trolley,Turnover box car, toys for children, Children swaying electric machine,
The auto products are including expansion tank, windshield washer bottle, oil tank, coolant reservoir, ventilation duct, intake hose,pressure vent-pipe, bus seat..
The welding mould are includ the hot plat welding mould and vibration welding mould.
ODM & OEM orders are welcomed.
What is the production time for expansion tank (surge tank ) mould?
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Precision CNC Machining | 5 days |
Drill | 5 days |
Polishing/carving | 3-5 days |
Assembling and Fitting | 5 days |
mould test | 2 days |
What is the production time for expansion tank radiator tank (surge tank) coolant reservoir production cycle ?
Processing | Time |
Prepare material | 5 days |
injection moulding or blow moulding | 10 days |
trial welding and testing | 3 days |
mass welding and testing | 7 days |
package | 3-5 days |
book the shippment | 2-5 days |
container loading and delivery | 1 days |